Similar Projects
WY Nps 2017(1) Moose Wilson Road Phase 1
Term Contract
Design
Jackson, Teton Village, WY 83001

WY Flap 704(1) Skyline Drive & Fremont Lake Road
Term Contract
Bidding
Pinedale, WY 82941

Rancher Complete Street Project
Infrastructure
Bidding
Jackson, WY 83001

WY NPD Yell 14(1) Lewis River Bridge
Term Contract
Post-Bid
Yellowstone National Park, WY

WY NPD Yell 14(1) Lewis River Bridge
Term Contract
Post-Bid
Yellowstone National Park, WY

The Construction of 2021 Fall Street Patching Project
Infrastructure
Results
Jackson, WY 83002

District 3 Bridge Rehabilitation
Infrastructure
Results
WY

Bituminous Pavement Surfacing
Infrastructure
Bidding

District 3 Crack Seal
Infrastructure
Results

2022 Chip Seal Project
Infrastructure
Bidding
Jackson, WY

Grading, Concrete Slab Replacement, Bridge Rehabilitation, Temporary Concrete Barrier and Miscellaneous
Infrastructure
Results
WY

2022 Spring Street Patching Project
Infrastructure
Bidding
Jackson, WY

Pavement Surfacing, Rigid Concrete Overlay, Removal of Concrete, Bridge Rehabilitation, Temporary Concrete Barrier, MGS Guardrail, a+b Bidding and Miscellaneous Work
New Construction, Infrastructure
Results

WY Flap 740(1) Skyline Drive & Fremont Lake Road
Term Contract
Bidding
Pinedale, WY 82941

Last Updated 01/17/2022 01:42 AM
Project Title

Milling Plant Mix, Bituminous Pavement Surfacing and Miscellaneous Work

Physical Address View project details and contacts
City, State (County) (Lincoln, Sublette, Sweetwater, Teton Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work involving milling plant mix, bituminous pavement surfacing and miscellaneous work at various locations in Transportation District 3 in Lincoln, Sublette, Sweetwater & Teton Counties Stp-Pm-b223028: 5 - Roadway Description: # Item Description Quantity Unit 1 106.05200 Contractor Testing 1.000 Ls 2 109.04000 Force Account Work 1,000.000 $$ 3 109.08000 Mobilization 1.000 Ls 4 202.03305 Milling Plant Mix 141,000.000 Sy 5 209.01000 Water 185.000 Mg 6 213.03110 Overburden Placing 5,000.000 Cy 7 215.01000 Contractor Storm Water Control 1.000 Ls 8 401.02000 Hot Plant Mix 20,500.000 Ton 9 401.03321 Asphalt Binder (Pg 58-28) 465.000 Ton 10 401.03329 Asphalt Binder (Pg 76-28) 705.000 Ton 11 407.01000 Tack Coat 40.000 Ton 12 413.01000 Hydrated Lime 225.000 Ton 13 703.03100 Flagging 1,500.000 Hr 14 703.03110 Temporary Traffic Control 1.000 Ls 15 703.03200 Sequential Chevron 1.000 Ls

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents