Similar Projects
Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Design
Less than $75,000,000 est. value
Washington, DC

SRTS Chesapeake City Elementary School
Infrastructure
Post-Bid
$100,001 to $500,000 est. value
Chesapeake City, MD

Milling Services-Cecil County
Infrastructure
Post-Bid
Less than $50,000 est. value
Elkton, MD

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Various Permanent Patching of Asphalt Superpave at Various Locations
Results
$1,000,001 to $2,500,000 est. value
MD

Asphalt Overlay Calendar Year 2022
Term Contract, Infrastructure
Post-Bid
$2,500,000 est. value

Crack Sealing at Various Locations
Results
$500,001 to $1,000,000 est. value

Microsurfacing and Fog Sealing at Various Locations
Results
$1,000,001 to $2,500,000 est. value

Chip Seal at Various Locations
Results
$1,000,001 to $2,500,000 est. value

Entrance Road Paving, Fair Hill Natural Resource Management Area
Results
Less than $50,000 est. value
Elkton, MD 21921

Miscellaneous Roadway Structure Repairs at Various Locations
Results
$1,000,000 to $2,500,000 est. value

Cabin 11 - Foundation Waterproofing, New Germany State Park, Garrett County
Results
Less than $50,000 est. value
Grantsville, MD 21536

Interstate 295 Miscellaneous Roadway Improvements
Results
$3,900,000 est. value
Wilmington, DE 19801

Road Reclamation
Term Contract
Results
Elkton, MD

Pavement Maintenance
Term Contract
Results

Last Updated 03/30/2022 01:16 PM
Project Title

Asphalt Overlay - Phase II

Physical Address View project details and contacts
City, State (County) Elk Neck, Elkton, Rising Sun, MD   (Cecil County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

he project generally consists of milling, asphalt patching, HMA wedge and level, HMA surface course and placement of stone shoulders. Subbase/subgrade repair, pavement fabric, and underdrains and other contingent construction items may be required for this project. Millings shall become the property of the contractor and all millings shall be disposed of properly. No petroleum material shall be used for a release agent in the truck bed or on tools and other equipment.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents