Similar Projects
Warehouse / Manufacturing
New Construction - 2,500,000 SF
Conception
$2,000,000 est. value
East Hartford, CT 06118

105 International Drive Warehouse
New Construction, Infrastructure - 248,000 SF
Conception
$27,000,000 CJ est. value
Windsor, CT 06095

Commercial Building
New Construction - 25,800 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Manchester, CT 06042

Masotti Electric
New Construction - 5,000 SF
Design
Southington, CT

Exterior Lead Paint Abatement and Siding Repair Holcomb Farm Farmhouse
Term Contract, Renovation, Infrastructure
Post-Bid
$40,000 CJ est. value
West Granby, CT 06090

Arrowhead Redevelopment Project
Renovation
Results
Hartford, CT 06103

Design, Construction, Financing, Operation & Management of Landside Real Estate Development at Hartford-Bradley International Airport
New Construction
Results
Windsor Locks, CT 06096

Budney Aerospace
New Construction - 60,000 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Berlin, CT

Distribution Facility
New Construction - 182,000 SF
Construction
$10,000,000 CJ est. value
South Windsor, CT

Mastrianni Place Commercial Buildings
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Southington, CT 06489

67 Kennedy Road Warehouse and Distribution Center
New Construction, Infrastructure - 241,800 SF
Pending Verification
$26,000,000 CJ est. value
South Windsor, CT 06074

Industrial Park
New Construction - 35,940 SF
Design
Southington, CT 06489

Conard High School Loading Dock Replacement
Renovation
Results
West Hartford, CT 06107

Amazon
New Construction - 823,000 SF
Construction
$50,000,000 est. value
Windsor, CT 06095

Captain Lewis Drive Industrial Building
New Construction, Infrastructure - 10,000 SF
Pending Verification
$1,000,000 CJ est. value
Southington, CT 06489

Last Updated 01/25/2023 05:02 PM
Project Title

Four Seasons Farm

Physical Address View project details and contacts
City, State (County) Suffield, CT 06078   (Hartford County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Manufacturing/Processing Plant
Contracting Method Bids by Invitation
Project Status Conceptual Design, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $100,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of an indoor tomato farm/greenhouse facility in phases. Phase I 10.02 acre greenhouse, support building, parking, loading, utility work, water towers, and establishing the plantings in the conservation easement on the east side of the property next to the brook. Phase II 8.81 acres of greenhouse, access drives, drainage facilities. Phase III 12.74 acres of greenhouse, access drives, drainage facilities. Phase IV 8.75 acres of greenhouse access drives, drainage facilities. Phase V 2.5 acres of greenhouse access drives, drainage facilities. As of January 25, 2023, this project has obtained site plan modification approval. No building permit applications have been submitted for the project. Information regarding the selection of an architect and general contractor has not been released. The owner does not wish to disclose any project information. No timeline has been announced.

Details

,, 1,962,770 SF - 1,865,642 SF. 97,128 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents