Similar Projects
Nickerson Schools Renovation - 2023 Bond - Nickerson Unified School District
Renovation
Conception
$10,500,000 CJ est. value
Nickerson, KS 67561

Roofing - 2022 Bond - Olathe Public Schools USD 233
Build-out
Conception
$10,000,000 CJ est. value
Olathe, KS 66061

New Middle School
New Construction - 146,000 SF
Design
$46,500,000 est. value
Topeka, KS

New Washburn Rural Middle School - 2022 Bond - Auburn Washburn Public Schools
New Construction, Infrastructure - 138,000 SF
Design
$48,647,000 CJ est. value
Mission, KS 66614

Dodge City Schools Alternative Education Building Renovation
Renovation - 1,000 SF
Bidding
$100,000 CJ est. value
Dodge City, KS 67801

Shawnee Mission East High School
Renovation, Addition
Post-Bid
Prairie Village, KS 66208

Wellsville High School, Middle School, & Elementary School
Renovation, Addition
Post-Bid
$5,000,000 est. value
Wellsville, KS

Construction Management At-Risk Services
New Construction
Results
Inman, KS

Prairie Hills School
Renovation, Addition - 12,000 SF
Results
Sabetha, Wetmore, KS 66534

Washburn Rural Middle School Summer '23 Package
Renovation - 17,500 SF
Construction
$1,400,000 CJ est. value
Topeka, KS 66619

Wonder
Renovation - 18,300 SF
Pending Verification
$1,500,000 CJ est. value
Wichita, KS 67226

Career and Technical Education Facility Upgrades - 2022 Bond - Mission Valley School District
Renovation
Pending Verification
$2,000,000 CJ est. value
Eskridge, KS 66423

Asphalt/Concrete - 2022 Bond - Olathe Public Schools USD 233
Infrastructure
Conception
$8,500,000 CJ est. value
Olathe, KS 66061

Washburn Rural High School New CTE, Multipurpose Room & Renovations
New Construction, Renovation - 82,000 SF
Design
$27,500,000 est. value
Topeka, KS 66619

Shawnee Mission Early Childhood Center Remodel Phase 1
Renovation
Post-Bid
Overland Park, KS 66204

Last Updated 06/14/2023 04:06 PM
Project Title

High School - 2022 Bond - Hesston USD 460

Physical Address View project details and contacts
City, State (County) Hesston, KS 67062   (Harvey County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids
Project Status Schematic Drawings, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project work includes: Renovate auditorium New physical conditioning room New FEMA storm shelter/wrestling room Renovate FACS room Flooring upgrades LED lighting replacements As of June 14, 2023, this project is in the design phase. The bond has been approved. An architect and construction manager at risk (CMAR) have been selected for the project. A firm timeline for construction has not been determined.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents