Similar Projects
Komarek School New Gymnasium Construction
New Construction
Conception
North Riverside, IL

2022 Schools Improvements
Renovation
Bidding
Skokie, IL 60076

Restrooms and Locker Rooms Rehabilitation
Renovation
Bidding
$680,000 est. value
Burnham, IL 60633

Standby Generator Testing, Maintenance and Repair Services
Term Contract
Post-Bid
Chicago, IL 60605

Lighting Replacement at Rolling Meadows Library
Post-Bid
Rolling Meadows, IL 60008

Pullman State Historic Site Development
Renovation
Results
Less than $1,500,000 est. value
Chicago, IL 60628

Beard ES MCR & TUS
Renovation
Results
$15,000,000 est. value
Chicago, IL 60602

Arie Crown Hebrew Day School
Renovation, Addition - 165,000 SF
Construction
$20,000,000 est. value
Skokie, IL 60076

Worth Elementary
Renovation, Addition
Construction
Worth, IL 60482

Joseph Sears School Bid Package #3
Renovation, Addition
Bidding
Kenilworth, IL 60043

Yards College Preparatory High School Marquee Sign
Post-Bid
Chicago, IL 60609

Switch Gear Reconditioning & Preventative Maintenance
Results
IL 60141

CPS Falconer Elementary MEP
Renovation
Bidding
Chicago, IL 60641

Electrical Upgrades
Post-Bid
Chicago, IL

Lighting Fixture Upgrades
Results
Hazel Crest, Markham, IL 60428

Last Updated 01/19/2022 01:24 PM
Project Title

CPS Fuller ES - Dubois ES MEP and FP Renovations

Physical Address View project details and contacts
City, State (County) Chicago, IL 60653   (Cook County)
Category(s) Education, Single Trades
Sub-Category(s) Electric, Elementary School, Fire Protection, Mechanical, Plumbing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replace existing mechanical items throughout the school and associated architectural items affected by this work. Replace all unit ventilator units and limited metal shelving affected by the replacement. Replace RTU’s serving the Gym and the Lunchroom. Reinforce the structure to support the new RTU locations. Provide associated exterior, roof mounted ductwork. Remove and replace one existing Boiler and provide connection to the second boiler as a way to provide redundancy. Provide supported pipe run in corridor connecting the two boiler rooms for this. Provide ceiling and lighting in the lunchroom. Provide resilient floor patching at each classroom to accommodate unit vent replacement. Provide larger louver openings with lintels at exterior walls for unit vents. Provide a new fire alarm system and intercom system. Prep, prime and paint all spaces in the school. Provide replacement of roof mounted exhaust fans with associated curbs. Provide roof assembly patching, flashing and limited replacement of gravel stop type roof edge where roof patch coincides with roof edge. The work also consists of scope that is isolated as alternate bid work: As part of Alternate Bid 01, remove and replace galvanized pipe water lines with copper water lines. Remove and replace glazed CMU and other masonry walls/ceilings/casework concealing these pipes to accommodate the work. Remove and reinstall all plumbing fixtures and associated accessories to accommodate the work on the plumbing lines. This work affects all toilet rooms, classroom sinks, drinking fountains and the Kitchen. As part of Alternate Bid 02, provide a water heater. Provide mechanical screening as part of Alternate Bid 03.

Details

Elementary School, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents