Similar Projects
Bleacher Concrete Pad
Alteration
Post-Bid
Windham, NH 03087

Bellamy Ridge (Red Barn Drive) Completion
Infrastructure
Post-Bid
$700,000 CJ est. value
Dover, NH 03820

Cleveland Fb Temporary Concrete Repairs
Term Contract
Results
$25,000 to $100,000 est. value
Concord, NH

Transfer Station Concrete
Alteration
Results
Sanbornton, NH

Concrete (Delivered and/or Pumped)
Term Contract
Post-Bid
Concord, NH 03301

Highway Department Items - Block and Concrete Products
Term Contract
Results
Pelham, NH

Concrete (Delivered and/or Pumped)
Term Contract
Post-Bid
Concord, NH 03301

Greenfield State Park Pot Washing Stations Slabs and Firewood Shed Foundation
Alteration
Results
Greenfield, NH 03047

Signal / ITS Prime
Infrastructure
Post-Bid
$2,186,825 CJ est. value
Concord, NH 03301

Precast Concrete Structures
Alteration
Results
Dover, NH

Concrete (Delivered and/or Pumped)
Term Contract
Post-Bid
Concord, NH 03301

Tara Estates Sewer Pump Station Upgrade
Renovation
Results
$1,376,500 CJ est. value
Rochester, NH 03867

Reinforced Concrete Culvert Pipe Class IV and V
Term Contract
Post-Bid
Concord, NH 03301

1.5 MG Water Storage Tank Rehabilitation
Renovation
Results
$525,000 CJ est. value
Swanzey, NH 03446

Poverty Lane Paving
Infrastructure
Results
$338,664 CJ est. value
Lebanon, NH 03766

Last Updated 02/17/2023 09:01 PM
Project Title

Beach Grading at Hampton Beach State Park

Physical Address View project details and contacts
City, State (County) Hampton, NH 03842   (Rockingham County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $36,880 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Beach Grading at Hampton Beach State Park Description: Over the course of the winter, sand from Hampton Beach has been redistributed by wind and wave action so that large volumes of sand have been piled up against the concrete seawall that runs the length of the beach. This project involves re-grading the sand away from the seawall to the low tide line over the length of Hampton Beach, and removing sand out of the stairwells and off the ramps. The start date for the Project will be April 15,2Û23 and the completion date will be no later than 12:00 pm on May 5, 2023.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents