Similar Projects
Hontubby-Walker Mountain Preliminary - Prior to 09/30/21
Term Contract
Design
OK

Clearing of the Properties
Infrastructure
Bidding
Granite, OK

Waste Disposal - Landfill Services
Infrastructure
Bidding
Tulsa, OK

Removal of Tree Limbs
Post-Bid
Oklahoma City, OK

4-1-2021A Property Abatement and Clean-up
Post-Bid
Anadarko, OK

Solid Waste & Disposal
Term Contract
Results
OK

Solids Removal and HDPE Liner Replacement
Infrastructure
Results
$500,000 est. value
McAlester, OK 74501

As Needed Disaster Restoration and Property Recovery Services
Infrastructure
Bidding
Stillwater, OK

Pallet Removal
Term Contract
Post-Bid
Oklahoma City, OK 73145

Refuse Collection Services for Robert S. Kerr Lake, Ok
Term Contract
Results
OK

Wastewater Treatment Plant Bio-Solids Removal, Hauling and Disposal By Agricultural Land Application
Infrastructure
Bidding
Muskogee, OK

Abatement and Clean-Up
Infrastructure
Post-Bid
Anadarko, OK

Canton Lake, Refuse Collection Services
Term Contract
Results
Canton, OK 73724

Hauling of Rock
Term Contract
Bidding
El Reno, OK

Base Recycling
Term Contract
Post-Bid
Oklahoma City, OK 73179

Reported 06/08/2022 12:00 AM
Project Title

Construction Plan for East Wastewater Treatment Plant Flow Equalization Basin Solids Removal and Liner Replacement

Physical Address View project details and contacts
City, State (County) McAlester, OK 74501   (Pittsburg County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $850,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project generally consists of the removal and mechanical dewatering of approximately 3 million gallons of sludge from the 9 million gallon Flow Equalization Basin (FEB9), hauling to and disposal of the dewatered sludge at the McAlester Municipal Landfill, removal and disposal of the existing HDPE liner and associated geotextile fabric liner, installation of approximately 152,000 square feet of new 60 mil HDPE liner, installation of a new french drain, outlet pipe and geotextile fabric liner in FEB9.

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents