Similar Projects
Wastewater Treatment Plant - Village of Marcellus
Renovation
Conception
$4,400,000 est. value
Marcellus, NY

Blind Brook Waste Water Treatment Plant
Renovation
Conception
$3,500,000 CJ est. value
White Plains, NY 10601

Brookview Village - Expansion Phase III
Infrastructure
Design
$500,000 to $1,000,000 est. value
Greenfield Center, NY 12833

Gasport Sewer District 1 Wastewater Disinfection - Town Of Royalton
Renovation, Infrastructure
Design
$650,000 CJ est. value
New York, NY 10036

Onsite Wastewater Treatment Systems
Term Contract
Bidding
NY

Sturgeon Point Water Treatment Plant Washwater Tank Replacement
Infrastructure
Bidding
$700,000 CJ est. value
Derby, NY 14047

Wastewater Treatment Facility Instrumentation and Control Maintenance
Term Contract
Post-Bid
Huntington, NY

Wastewater Treatment Plant Improvements
Renovation
Post-Bid
Clyde, NY 14433

Wastewater Treatment Facility Improvements
Renovation
Results
Corning, NY

Village of Florida RBC #4 Rebuild Project
Renovation
Results
Florida, NY 10921

WPCP Secondary Treatment Upgrade
Construction
$60,650,000 to $69,500,000 est. value
Utica, NY 13502

Honeoye Lake Wastewater Treatment Plant Improvements
Renovation
Construction
Honeoye, NY 14471

Rogers Multifamily Residential
New Construction
Pending Verification
Westhampton Beach, NY 11978

Indian Hills Water System
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Lewisboro, NY 10536

Water Resource Recovery SPK41
Infrastructure
Conception
$5,300,000 CJ est. value
White Plains, NY 10601

Last Updated 01/06/2023 07:02 AM
Project Title

Roger Mabie Water Treatment Plant Improvements - Electrical, Plumbing and HVAC

Physical Address View project details and contacts
City, State (County) Ulster Park, NY 12487   (Ulster County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Results, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $41,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of miscellaneous improvements to the water treatment plant including tank painting, process equipment, including pumps, piping, meters, etc.; electrical equipment, including main distribution switchboard, panel board, etc.; structural components, including spalled concrete, corroded steel, etc.; and architectural components, including door frames, jambs, metal paneling, etc. Bids shall be on a unit price basis, as indicated in the Bid Form.The work consists of miscellaneous improvements to the water treatment plant including tank painting, process equipment, including pumps, piping, meters, etc.; electrical equipment, including main distribution switchboard, panel board, etc.; structural components, including spalled concrete, corroded steel, etc.; and architectural components, including door frames, jambs, metal paneling, etc. Bids shall be on a unit price basis, as indicated in the Bid Form. A bid security shall be furnished in accordance with the Instructions to Bidders. The successful bidder will also be required to provide performance and payment bond in the amount of 100% of the value of the contract. The time period for holding Bids, is 45 days after opening of Bids, excluding Saturdays, Sundays, and legal holidays. Disadvantaged Business Enterprise (DBE) goals are applicable to the total dollars paid to the construction contract. The goals for this project are a minimum of 20.0 percent M/WBE participation by certified DBEs. The bidder shall submit completed DBE forms with the bid. Section 00800 contains the funding program construction contract requirements for M/WBE participation. Failure to comply with the requirements of this paragraph may be deemed to render a proposal non- responsive. No waiver of any provision of this section will be granted unless approved by the New York State Environmental Facilities Corporation. This project is subject to New York State Prevailing Wage Rates. Federal Minimum Wage Rates as determined by the United States Department of Labor under the Davis-Bacon Act also apply to this project. Whichever of the wage rates is higher will apply. It is the responsibility of the Contractor, before Bid opening, to request if necessary, any additional information on Minimum Wage Rates for those trades people who may be employed for the proposed Work under this Contract.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents