Similar Projects
Corporation Yard Building "J" Structural Repair and Upgrades - City of San Clemente
Renovation
Conception
$250,000 CJ est. value
San Clemente, CA 92672

CIP - Corto Lane Beach Restrooms Replacement - City of San Clemente
New Construction, Infrastructure
Conception
$500,000 CJ est. value
San Clemente, CA 92672

Administrative Office Building Replacement - East Orange County Water District (EOCWD)
New Construction, Infrastructure
Design
$6,000,000 CJ est. value
Orange, CA 92866

California Uniform Public Construction Cost Accounting Act
Term Contract
Design
Brea, CA 92821

RFP Design - Electrical Design Services for City Hall and Bell Tower Regional Community Center (BTRCC) Interior LED Lighting Conversion
Renovation
Bidding
$400,000 CJ est. value
Rancho Santa Margarita, CA 92688

Tustin Hangar No. 2 Maintenance, Repairs and Voluntary Upgrades
Infrastructure
Bidding
$5,700,000 CJ est. value
Tustin, CA 92780

Citywide Tree Maintenance Services
Term Contract
Sub-Bidding
Cypress, CA 90630

Rapid Response Single Award Task Order Contract (SATOC)
New Construction
Post-Bid
Less than $95,000,000 est. value

General Contractor for Office Renovations for 9th and 10th Floor
Renovation
Post-Bid
$80,000 est. value
Orange, CA 92868

Lifeguard Tower Refurbishments
Renovation
Results
Huntington Beach, CA 92468

Arden Modjeska (ARMO) Stone House Restoration
Renovation - 627 SF
Results
$900,000 est. value
Silverado, Tustin, CA 92676

Junior Lifeguards Building - 19F13 - City of Newport Beach
New Construction
Construction
$3,150,000 CJ est. value
Newport Beach, CA 92663

Corps of Engineers Sand Replenishment - Construction - City of San Clemente
Infrastructure
Conception
$1,900,000 CJ est. value
San Clemente, CA 92672

9th Floor TI Services
Renovation
Bidding
$2,000,000 CJ est. value
Orange, CA 92868

Job Order Contract (JOC) For General Building Services
New Construction
Post-Bid
Tustin, CA

Last Updated 06/21/2023 01:13 PM
Project Title

Civic Center Generator Replacement and Secured Lot Electrical Upgrades

Physical Address View project details and contacts
City, State (County) Irvine, CA 92606   (Orange County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $1,676,710 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed shall include, but not be limited to: The project will remove and replace the existing standby diesel generator at the Civic Center. Additionally, the automatic transfer switch will be replaced and a triple switch allowing for temporary generator docking will be added. The project will also include all necessary electrical infrastructure, and other items not mentioned here, but are required by the plans and the Special Provisions. Reference attached Specifications PREVAILING RATES OF WAGES: Prevailing wage requirements apply to public works projects with a value exceeding $1,000.00. The definition of public works is found at Labor Code Section 1720, et seq. Q&A Deadline 05/31/2023 4:00 PM (PDT) Estimated Bid Value $1,676,710 Start/Delivery Date Estimated July, 2023 Project Duration 150 Working Days The City reserves the right, after opening bids, to reject any or all bids, to waive any informality in a bid, to make awards in the interest of the City, and to reject all other bids. Prime Contractor must possess a valid Class C-10 license. At the time of submitting the bid, the Bidder shall be licensed as a contractor in accordance with the provisions of California Business and Professions Code Chapter 9, Division 3. Work for this item Shall include the procurement, delivery, and installation of the Generator/Base Fuel Tank, Automatic Transfer Switch, and Triple switch to include all conduit and cabling per the project plans and specifications. Temporary portable generator will be required as standby for all scheduled shutdowns to sustain critical operations for the Civic Center and all other indirect costs associated with completing the work.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents