Similar Projects
Patapsco Centrate Treatment Facilities - 551-150
Renovation
Conception
$54,473,000 est. value
Baltimore, MD 21226

Broadneck Water Reclamation Facility Upgrade - S797900 - Anne Arundel County
Renovation
Conception
$11,437,883 CJ est. value
Annapolis, MD 21409

Primrose School / Annapolis
New Construction, Infrastructure - 12,405 SF
Design
$3,000,000 CJ est. value
Annapolis, MD 21403

Crofton Meadows II Expansion - Phase II - W801400 - Anne Arundel County
Addition, Infrastructure
Design
$61,194,000 CJ est. value
Crofton, MD 21114

Improvements to the PST Scum Collection System at the Patapsco Wastewater Treatment Plant
Renovation
Bidding
$10,000,000 CJ est. value
Baltimore, MD 21226

Pier 4 Replacement Fairfield Marine Terminal
Infrastructure
Bidding
$15,000,000 CJ est. value
Baltimore, MD 21226

AutoZone #6782 / Odenton
New Construction, Infrastructure - 6,446 SF
Post-Bid
$250,000 CJ est. value
Odenton, MD 21113

Unaccompanied Enlisted Personnel Housing (UEPH) Barracks Replacement at Fort Meade, Maryland
Demolition, New Construction, Infrastructure
Post-Bid
$100,000,000 CJ est. value
Fort Meade, MD 20755

Police Training Center - Site Development
Infrastructure
Results
$1,000,001 to $2,500,000 est. value
Baltimore, MD 21226

Maryland City Water Reclamation Facility (WRF) Utility Water Pump Replacement
Renovation
Results
$618,525 CJ est. value
Laurel, MD 20724

Chrysalis House at Crownsville
New Construction, Addition - 33,100 SF
Construction
Crownsville, MD 21032

Alion Science & Technology
Renovation
Construction
Hanover, MD 21076

Leisure Pools Office Building
New Construction - 3,600 SF
Pending Verification
$500,000 to $1,000,000 CJ est. value
MD 21225

Gambrill's Station
New Construction - 44,863 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Millersville, MD 21108

Fire Equipment Maintenance Facility - C571900 - Anne Arundel County
New Construction, Infrastructure
Conception
$16,742,000 CJ est. value
Glen Burnie, MD 21061

Last Updated 11/22/2022 12:01 PM
Project Title

Broadwater Operations Building Addition

Physical Address View project details and contacts
City, State (County) Shady Side, MD 20733   (Anne Arundel County)
Category(s) Commercial, Heavy and Highway, Sewer and Water
Sub-Category(s) Office, Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $1,902,451 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of June 21, 2022, the project has been awarded. A timeline for construction has not been confirmed. 19-017 F&R Project No. 68X-0085 The Work shall be done in a phased manner and includes the following major items: Phase 1 - The addition of a 1,977 SF office and administrative space, and the renovation of the adjacent 1,938 SF administrative space. Facility upgrades will incorporate new duct bank runs as indicated on drawings to support utility and plant systems upgrades. Plant systems upgrades to be performed under separate contract. Phase 2 - The addition of a new adjacent parking lot, storm water management areas and site lighting as indicated on drawings. This portion of the work to be priced as an Add Alternate and bidder will be required to guarantee pricing for a period of 6 months after bid date. The cost range for the Project is: $1,000,000.00 to $2,000,000.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This Contract will be constructed under the provisions of the Anne Arundel County Government January, 2001 "Standard Details and Specifications for Construction" and any subsequent revisions thereto. It is the policy of Anne Arundel County, Maryland, to ensure equal employment opportunity for all persons, and to ensure that minority and women-owned business enterprises have the maximum opportunity to participate in the performance of all county contracts for supplies and services. FOR ADA ACCESSIBILITY ASSISTANCE ONLY: TTY users, please call via Maryland Relay 7-1-1. All materials are available in an alternative format upon request. Questions regarding this Project should be directed to the PROJECT MANAGER, Lisa Deanes at 410-224-1279. Phase 2 of this project is an Add Alternate, if the price is within budget it will be awarded to the same vendor as Phase 1. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents