Similar Projects
Bridge Reconstruction Program - 11086 - City of Sioux Falls
Demolition, New Construction, Infrastructure
Conception
$14,585,000 CJ est. value
Sioux Falls, SD 57104

RR Grade Separation, CE
Infrastructure
Conception
$10,000,000 CJ est. value
Sioux Falls, SD 57107

Wastewater Improvement Project
Infrastructure
Design
$70,000 CJ est. value
Pickstown, SD 57367

Corn Palace Renovation
Renovation, Infrastructure
Design
$42,000,000 CJ est. value
Mitchell, SD 57301

Cold Milling and Asphalt Concrete Surfacing - Yankton Area
Infrastructure
Bidding
$4,965,000 CJ est. value
Olivet, SD 57052

DOH Public Health Laboratory
New Construction, Infrastructure - 60,000 SF
Sub-Bidding
$53,000,000 CJ est. value
Pierre, SD 57501

Sanitary Sewer Rehabilitation (Rebid)
Infrastructure
Post-Bid
$600,000 CJ est. value
Eureka, SD 57437

RFP D/B - Architectural and Engineering Services, Mineral Industries Building
New Construction, Infrastructure
Post-Bid
$34,000,000 CJ est. value
Rapid City, SD 57701

Brandon Core Area Reconstruction Phase 2
Infrastructure, Alteration
Results
Brandon, SD

Asphalt Surface Treatment
Infrastructure
Results
$2,281,045 CJ est. value
Olivet, SD 57052

Block 5 Project
New Construction, Infrastructure - 7,000 SF
Construction
$60,000,000 CJ est. value
Rapid City, SD 57701

Bond New Elementary School - Vermillion School District 13-1
Demolition, New Construction, Renovation, Infrastructure
Construction
$26,000,000 CJ est. value
Vermillion, SD 57069

WholeStone Farms Pork Harvesting And Processing Facility
New Construction, Infrastructure
Pending Verification
$500,000,000 CJ est. value
Sioux Falls, SD 57104

1st Avenue Mixed Use Development
New Construction, Infrastructure - 5,000 SF
Pending Verification
$28,000,000 CJ est. value
Sioux Falls, SD 57104

Interchange Reconstruction
Infrastructure
Conception
$50,978,000 CJ est. value
Sioux Falls, SD 57103

Last Updated 02/14/2024 12:11 PM
Project Title

Water Meter, Water Tower And Lift Station Improvements

Physical Address View project details and contacts
City, State (County) Saint Lawrence, SD 57373   (Hand County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected April 2022
Bids Due View project details and contacts
Estimated Value $52,214 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Bid Schedule A: Water Meter Improvements Install 30 5/8" water meters in retractable base pit; replace 75 5/8" water meters; replace 2 1.5" water meters; remove meter, furnish and install 5/8" water meter idler; test operate curb stop and verify valve shuts off; and all related appurtenances to the aforementioned work Bid Schedule B: Water Tower Rehabilitation Install aviation light and electrical work; sandblast and recoat interior and exterior surfaces; seal roof/wall seams and holes; raise overflow; remove spider rod assembly; safety climb system on roof ladder; anti-climb assembly at bottom of ladder; and all related appurtenances to the aforementioned work. Bid Schedule C: Lift Station Improvements Remove and replace pumps, base elbow and rails; remove and replace control panel; prepare surfaces and coat pipes, valves and fittings in vault; and all related appurtenances to the aforementioned work. A bid bond in an amount equal to ten percent (10%) of the total bid will be accepted in lieu of a certified check or bank draft. Surety for bid bond must be authorized to do business in the State of South Dakota. The goal for Minority-Owned Business Enterprise (MBE) on this project is one percent (1%) and the goal for Woman-Owned Business Enterprise (WBE) on this project is four percent (4%). The Owner reserves the right to reject any or all bids and to waive any informalities in the bidding and make awards to the Owner's best interest. Custom Bid Result Auch Plumbing and Heating Water Meter Improvements 52,214 Champion Tank Services LLC Water Tower Rehabilitation 114,800

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents