Similar Projects
Last Updated | 01/14/2022 07:40 AM |
Project Title | Bridge Painting - D09-BH-FY2022 (B) |
Physical Address | View project details and contacts |
City, State (County) | OH (Adams County) |
Category(s) | Single Trades |
Sub-Category(s) | Painting |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | For Improving Various Sections Of Oliver, Meigs And Nile Townships, Of Adams County And Scioto County, Of The State Of Ohio, In Accordance With Plans And Specifications By Painting The Structural Steel Of Three Bridges On Sr-32 And Us-32, Including Minor Structural Repairs. Section 0001 Roadway Line Alt Item Code Item Description Wt Unit Quantity 0001 201e11000 Clearing And Grubbing (Wt: 01) 01 Ls 1.000 Section 0002 Erosion Control Line Alt Item Code Item Description Wt Unit Quantity 0002 659e10000 Seeding And Mulching (Wt: 46) 46 Sy 5,000.000 0003 659e14000 Repair Seeding And Mulching (Wt: 46) 46 Sy 250.000 0004 659e20000 Commercial Fertilizer (Wt: 46) 46 Ton 0.680 0005 659e31000 Lime (Wt: 46) 46 Acre 1.030 0006 659e35000 Water (Wt: 46) 46 Mgal 27.000 0007 832e30000 Erosion Control (Wt: 08) 08 Each 2,500.000 Section 0003 Maintenance Of Traffic Line Alt Item Code Item Description Wt Unit Quantity 0008 614e11110 Law Enforcement Officer With Patrol Car For Assistance (Wt: 39) 39 Hour 16.000 0009 614e21200 Work Zone Center Line, Class i, 740.06, Type i (Wt: 39) 39 Mile 0.190 0010 614e22210 Work Zone Edge Line, Class i, 6", 740.06, Type i (Wt: 39) 39 Mile 1.420 0011 614e24402 Work Zone Dotted Line, Class i, 6", 740.06, Type i (Wt: 39) 39 Ft 2,880.000 0012 614e26400 Work Zone Stop Line, Class i, 740.06, Type i (Wt: 39) 39 Ft 22.000 Section 0004 Structure Repair (Bridge No. Ada-32-0927 l) Line Alt Item Code Item Description Wt Unit Quantity 0013 513e10201 Structural Steel Members, Level Uf, As Per Plan (Wt: 24) 24 Lb 1,673.000 0014 514e00050 Surface Preparation Of Existing Structural Steel (Wt: 26) 26 Sf 18,968.000 0015 514e00056 Field Painting Of Existing Structural Steel, Prime Coat (Wt: 26) 26 Sf 18,968.000 0016 514e00060 Field Painting Structural Steel, Intermediate Coat (Wt: 26) 26 Sf 18,968.000 0017 514e00066 Field Painting Structural Steel, Finish Coat (Wt: 26) 26 Sf 18,968.000 0018 514e00504 Grinding Fins, Tears, Slivers On Existing Structural Steel (Wt: 26) 26 Mnhr 22.000 0019 514e10000 Final Inspection Repair (Wt: 26) 26 Each 32.000 Section 0005 Structure Repair (Bridge No. Ada-32-0927 r) Line Alt Item Code Item Description Wt Unit Quantity 0020 513e10201 Structural Steel Members, Level Uf, As Per Plan (Wt: 24) 24 Lb 1,059.000 0021 514e00050 Surface Preparation Of Existing Structural Steel (Wt: 26) 26 Sf 18,406.000 0022 514e00056 Field Painting Of Existing Structural Steel, Prime Coat (Wt: 26) 26 Sf 18,406.000 0023 514e00060 Field Painting Structural Steel, Intermediate Coat (Wt: 26) 26 Sf 18,406.000 0024 514e00066 Field Painting Structural Steel, Finish Coat (Wt: 26) 26 Sf 18,406.000 0025 514e00504 Grinding Fins, Tears, Slivers On Existing Structural Steel (Wt: 26) 26 Mnhr 22.000 0026 514e10000 Final Inspection Repair (Wt: 26) 26 Each 32.000 Section 0006 Structure Repair (Bridge No. Ada-32-1699 l) Line Alt Item Code Item Description Wt Unit Quantity 0027 514e00050 Surface Preparation Of Existing Structural Steel (Wt: 26) 26 Sf 7,295.000 0028 514e00056 Field Painting Of Existing Structural Steel, Prime Coat (Wt: 26) 26 Sf 7,295.000 0029 514e00060 Field Painting Structural Steel, Intermediate Coat (Wt: 26) 26 Sf 7,295.000 0030 514e00066 Field Painting Structural Steel, Finish Coat (Wt: 26) 26 Sf 7,295.000 0031 514e00504 Grinding Fins, Tears, Slivers On Existing Structural Steel (Wt: 26) 26 Mnhr 12.000 0032 514e10000 Final Inspection Repair (Wt: 26) 26 Each 17.000 Section 0007 Structure Repair (Bridge No. Ada-32-1699 r) Line Alt Item Code Item Description Wt Unit Quantity 0033 514e00050 Surface Preparation Of Existing Structural Steel (Wt: 26) 26 Sf 7,295.000 0034 514e00056 Field Painting Of Existing Structural Steel, Prime Coat (Wt: 26) 26 Sf 7,295.000 0035 514e00060 Field Painting Structural Steel, Intermediate Coat (Wt: 26) 26 Sf 7,295.000 0036 514e00066 Field Painting Structural Steel, Finish Coat (Wt: 26) 26 Sf 7,295.000 0037 514e00504 Grinding Fins, Tears, Slivers On Existing Structural Steel (Wt: 26) 26 Mnhr 12.000 0038 514e10000 Final Inspection Repair (Wt: 26) 26 Each 17.000 Section 0008 Structure Repair (Bridge No. Sci-52-0084) Line Alt Item Code Item Description Wt Unit Quantity 0039 202e11203 Portions Of Structure Removed, Over 20 Foot Span, As Per Plan Ls 1.000 (Wt: 31) 31 0040 513e10201 Structural Steel Members, Level Uf, As Per Plan (Wt: 24) 24 Lb 883.000 0041 514e20001 Field Painting Of Damaged Structural Steel, As Per Plan (Wt: 26) 26 Sf 2,412.000 Section 0009 Incidentals Line Alt Item Code Item Description Wt Unit Quantity 0042 100e00300 Premium On Railroads' Protective Public Liability And Property Ls 1.000 Damage Liability Insurance (Wt: Nr) Nr 0043 103e05000 Premium For Contract Performance Bond And For Payment Bond Ls 1.000 (Wt: Nr) Nr 0044 614e11000 Maintaining Traffic (Wt: 39) 39 Ls 1.000 0045 624e10000 Mobilization (Wt: Nr) Nr Ls 1.000 |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |