Similar Projects
Bryant Middle School Science Lab Remodel
Renovation
Post-Bid
Salt Lake City, UT 84102

Skyline High School Replacement Athletics
Post-Bid
Salt Lake City, UT 84109

Building 72 Eae Master Plan and Phase 1 Buildout
Results
Less than $328,231 est. value
Salt Lake City, UT

Cottonwood High Theater Remodel
Renovation
Results
Less than $100,000 est. value
Murray, UT 84121

American Academy of Innovation Charter School
Addition - 3,285 SF
Construction
South Jordan, UT 84095

Granite Education Center Lobby and Cafe Remodel
Construction
$300,000 to $350,000 est. value
Salt Lake City, UT 84115

Beehive Academy
New Construction - 77,584 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Draper, UT 84020

Union Middle School Replacement
Term Contract
Post-Bid
$55,000,000 est. value
Sandy, UT 84070

Portable Classroom General Repairs
Term Contract
Results
Less than $40,000 est. value
Salt Lake City, UT

Oquirrh Hills Middle Remodel - Part II
Renovation
Construction
Riverton, UT 84065

Construction: GEC Cafe Dish Room Remodel
Renovation
Post-Bid
Salt Lake City, UT 84115

General Contractors Pre-Qualification
Results
Sandy, UT 84070

Granite Park Junior High School Remodel
Renovation
Construction
$1,500,000 est. value
Salt Lake City, UT 84115

New Cyprus High School
New Construction
Post-Bid
$145,000,000 est. value
Magna, UT 84044

Riverton High School Cafeteria Remodel Part II
Renovation
Results
Riverton, UT 84065

Reported 02/05/2020 12:00 AM
Project Title

Glendale Middle School Science Lab

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84104   (Salt Lake County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of an interior remodel to a classroom to convert it to one science classroom. Work of the project includes demolition of existing elements and removal and selective demolition as required in ceiling in rooms immediately below to facilitate new plumbing. Work includes wall, floor and ceiling finishes,architectural cabinets, and associated mechanical, plumbing, electrical and fire protection work.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents