Similar Projects
Refuse, Recycle and Yard Waste Collection
Term Contract
Sub-Bidding
Sterling Heights, MI 48312

Residential Refuse Collection & Disposal Service
Term Contract
Sub-Bidding
Mount Clemens, MI 48043

Mosquito Control Program
Term Contract
Post-Bid
Sterling Heights, MI 48313

HVAC Service Contract
Alteration
Post-Bid
Detroit, MI

As Needed Emergency Water, Sewer And Miscellaneous Utility Repairs
Term Contract, Alteration
Results
Eastpointe, MI

Airfield Insect Pest Control
Term Contract
Results
Harrison Township, MI 48045

Sanitary Sewer Cleaning and Cctv
Term Contract
Sub-Bidding
Sterling Heights, MI 48312

Jefferson Village and Light House Depot Summer Landscape Services
Term Contract
Post-Bid
Detroit, MI 48214

Lawn Services for School District
Term Contract
Sub-Bidding
New Haven, MI 48048

Requirements of MDOT Spec 23A Limestone
Term Contract
Post-Bid
Mount Clemens, MI 48043

Roadside Mowing and Litter Pickup/Disposal Services Oakland County
Term Contract
Post-Bid
West Bloomfield, MI 48323

Tub Grinding of Branches/Stumps and Removal of All Debris
Term Contract
Post-Bid
Warren, MI 48089

Grass Mowing and Trimming RE-BID
Term Contract
Post-Bid
New Baltimore, MI 48051

Requirements of Crushed Concrete, Release and Delivery as Required
Term Contract
Post-Bid
Clinton Township, MI 48035

Requirements of Asphalt Materials, Release and Delivery as Required
Term Contract
Post-Bid
Clinton Township, MI 48035

Last Updated 05/24/2023 03:17 PM
Project Title

Rubbish Removal

Physical Address View project details and contacts
City, State (County) Warren, MI 48093   (Macomb County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Certified check or proposal bond, if required, must accompany the proposal, at which time the proposals will be opened. No proposal will be considered unless a certified check or proposal bond is furnished, if required. Every person, firm, or corporation submitting any proposal for construction work, equipment, materials or services of any kind shall be required to furnish with such proposal a certified check or proposal bond in an amount indicated above which shall be forfeited to the Board of Education in case of failure of the proposer to sign a contract after acceptance of the proposal by the Board of Education. Quotations on equipment, materials or supplies must be F.O.B. point of delivery specified, including packing and crating charges, and fuel surcharges. The Board reserves the right to reject any or all proposals or parts of proposals, or to split award by items or to accept the proposal which will best serve the interest of the Board of Education.

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents