Similar Projects
Hot Asphaltic Concrete Pavement Overlay
Infrastructure
Bidding
Holbrook, AZ

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

Concrete Slope Pavement for N71 Birdsprings - Road Construction Project
Post-Bid
AZ

West Cooley and 4th Avenue Roadway Reconstruction
Results
Show Low, AZ 85901

Lakeside Ranger District Concrete and Asphalt Road Repairs
Results
Show Low, AZ 85901

Annual Road Maintenance Contract
Infrastructure
Post-Bid
Holbrook, AZ

Pavement Rehabilitation
Results
Less than $26,500,000 est. value
Show Low, AZ

2021 Street Maintenance
Infrastructure
Post-Bid
Winslow, AZ 86047

Pavement Rehabilitation
Results
Less than $26,500,000 est. value
Show Low, AZ

Asphalt Repair and Re-Pavement Materials and Services
Term Contract
Post-Bid
Buckeye, Douglas, Florence, Globe, Goodyear, Phoenix, Safford, Saint Johns, Somerton, Tucson, Winslow, AZ 85607

Citywide Roadway Improvement
Results
Less than $594,000 est. value
Show Low, AZ

Annual Road Maintenance Contract For Victory Heights Road Maintenance District
Infrastructure
Post-Bid
AZ

Snowflake Sewer Line and Street Improvements
Results
Snowflake, AZ

Fort Defiance N112 Road Improvements 3.06-Miles
Infrastructure
Post-Bid
AZ

Rehabilitation and Rejuvenation of Public Roadways/Slurry Seal
Results
Show Low, AZ

Reported 03/15/2022 12:00 AM
Project Title

N71 Birdsprings, Hot Mix Asphalt Paving

Physical Address View project details and contacts
City, State (County) Leupp Corner, AZ 86047   (Navajo County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Work is to apply prime coat and pave the project, including submittal of mix design, equipment, and manpower to complete the project. Vendor to provide adequate manpower, equipment, and materials for Prime Coat application and hot mix asphalt (HMA) paving on Navajo Route N71(6.2 miles), the Little Singer School access road (0.7 mile) and turnouts on a road construction project located in Birdsprings, Az.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents