Similar Projects
6-Inch CIP Water Main Lining
Infrastructure
Post-Bid
Colorado Springs, CO 80900

Design Build Services for Academy Corridor Isolation Valves Replacement Project
Infrastructure
Post-Bid
Colorado Springs, CO

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

All Division Horizontal Directional Drilling Services
Results
Colorado Springs, CO 80947

New Fire Station Utility
Construction
Falcon, CO 80831

Northern Regional Water Delivery Project Segment D
Infrastructure
Construction
Less than $500,000 est. value
Monument, CO

Z--Romo/239689, Moraine Park Campground and HQ Utilities-GAOA
Term Contract
Post-Bid
$10,000,000 est. value
Estes Park, CO 80517

Boddington Field Water Utility Construction
Results
Colorado Springs, CO

Clarksley Road and Mountain View Road Sanitary Sewer and Water Main Replacement
Results
Manitou Springs, CO 80829

Centralized Treatment Raw Water Line
Results
$300,000 to $350,000 est. value
Colorado Springs, CO 80906

Well No 4 Treatment Plant Connection Line
Results
Fountain, CO

Water System Improvement Project
Results
Falcon, CO

Water Utility Construction Services
Results
Less than $23,665 est. value
Colorado Springs, CO 80919

Rolling Hills Tank Inlet Pipeline
Results
Colorado Springs, CO

Cellular Domestic Water Meter Installation
Results
Colorado Springs, CO

Last Updated 11/02/2021 05:35 AM
Project Title

Water Distribution Repair and Replacement

Physical Address View project details and contacts
City, State (County) Monument, CO   (El Paso County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work in accordance with all rules, regulations, codes, ordinances, and laws of applicable regulatory and government agencies having jurisdiction over the areas the work is to be performed and shall provide all permits, tools, materials, equipment, traffic control and labor necessary for installing water valves, fire hydrants, and service saddles on potable water distribution pipelines.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents