Similar Projects
Clinton Avenue Improvements - City Of Huntsville
Infrastructure
Conception
$2,500,000 CJ est. value
Huntsville, AL 35801

Eastern Bypass - City Of Huntsville
Infrastructure
Conception
$10,600,000 CJ est. value
Huntsville, AL 35763

Oak Meadows
New Construction, Infrastructure
Design
Huntsville, AL 35810

Margaritaville Hotel / Madison
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Madison, AL 35758

Propulsion Systems Laboratory / Redstone Arsenal
Addition, New Construction, Renovation, Infrastructure
Bidding
$100,000,000 CJ est. value
Redstone Arsenal, AL 35808

Green Mountain Booster Station and Pipeline Installation
Infrastructure
Bidding
$400,000 CJ est. value
Huntsville, AL 35801

Transit Transfer Station
New Construction, Infrastructure
Post-Bid
$15,677,228 CJ est. value
Huntsville, AL 35801

Kroger U-606 / Madison
Demolition, Infrastructure, Build-out, Renovation - 89,892 SF
Post-Bid
$2,500,000 CJ est. value
Madison, AL 35758

Constellation Phase I Row Improvements
Infrastructure
Results
$809,415 CJ est. value
Huntsville, AL 35801

Highway 53 and Jeff Road Improvements
Infrastructure
Results
$1,191,129 CJ est. value
Harvest, AL 35749

Livano Town Madison
New Construction, Infrastructure - 422,545 SF
Construction
$119,000,000 CJ est. value
Madison, AL 35758

Meadows At Hampton Cove Phase 5
New Construction, Infrastructure
Construction
$4,000,000 CJ est. value
Owens Cross Roads, AL 35748

Paxton Place Apartments
New Construction, Infrastructure
Pending Verification
$125,000,000 CJ est. value
Madison, AL 35758

Carillon Oaks Madison
Demolition, New Construction, Infrastructure - 35,195 SF
Pending Verification
$9,500,000 CJ est. value
Madison, AL 35758

Holmes Avenue Improvements - City Of Huntsville
Infrastructure
Conception
$17,000,000 CJ est. value
Huntsville, AL 35805

Last Updated 07/24/2023 12:14 PM
Project Title

Starbucks At Constellation

Physical Address View project details and contacts
City, State (County) Huntsville, AL 35801   (Madison County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Site Development
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Location: Central City, south of Clinton Avenue and west of Heart of Huntsville Drive As of July 24, 2023, the project has been approved by the City of Huntsville Planning Commission. Information regarding the Architect and General Contractor is unknown. Construction start is undetermined.*

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents