Similar Projects
Boiler Maintenance and Repairs at Various Locations
Alteration
Bidding
NY

World Languages UV Replacement
Alteration
Bidding
North Salem, NY 10560

J045--High Pressure Boiler Plant Safety Device Testing, Tuning & Calibrations and Summer Maintenance High Pressure Boilers & Boiler Plant Equipment
Post-Bid
Castle Point, Montrose, NY 10548

J045-- Summer Maintenance High Pressure Boilers & Boiler Plant Equipment
Post-Bid
Montrose, Wappingers Falls, NY 10548

Replacement of Two Boilers at the Millwood Water Treatment Plant
Results
Chappaqua, NY 10514

Burner and Boiler Equipment Repair Services
Term Contract
Results
White Plains, NY

Electric Water Heater
Alteration
Post-Bid
NY

Boiler Maintenance Contract
Term Contract
Results
White Plains, NY

Yonkers School 25 Boiler Repairs
Alteration
Post-Bid
Yonkers, NY 10701

Countywide Boiler Maintenance
Term Contract
Results
NY

Steam Trap Survey, Repair and Improvements
Results
White Plains, NY 10604

Cooler
Results
NY

Amawalk Water Treatment Plant-Clarifier 1 and 2 Mechanical Work and Painting Project
Results
Amawalk, NY

Boiler Repair Project
Alteration
Results
Chappaqua, NY 10514

Boiler Replacement Vernon Plaza Family Center
Alteration
Results
$800,000 to $850,000 est. value
Mount Vernon, NY 10550

Reported 03/16/2022 12:00 AM
Project Title

Mechanical Piping and Boiler Installation

Physical Address View project details and contacts
City, State (County) Bedford, NY 10506   (Westchester County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: Coordination and identification of components to be demolished by others. Prior to any demolition, the existing steam piping shall be hydrotested to ensure its mechanical integrity. Any defective components will be replaced and shall not be priced in the scope of this RFP. Ecosystem and the contractor will agree on a price for replacement based on the T&M values in the bidding form. Contractor is responsible disconnecting all boiler services (steam, condensate, make up water, glycol, and fuel oil) prior to any demolition. Rigging of equipment into the work area by others. All on site placement and assembly of the boiler, pumps, and HW/Glycol heat exchanger, shall be the responsibility of the selected contractor. Ecosystem has purchased this equipment to ensure delivery on schedule. Furnish and install all plumbing fixtures required for the boiler installation. The contractor will be responsible for reconnecting the boilers to the existing oil service. Furnish and install all piping and equipment specified in bidform and Appendices B1 and B2, Ecosystem to supply the boilers, control valves, pumps, and the heat exchanger. All piping in public spaces shall be hidden above ceiling where feasible. Where infeasible, exposed pipe in public spaces shall be insulated and finished with a PVC jacket. No pipes shall run over lighting fixture or other ceiling mounted equipment. If the contractor’s plan deviates from these criteria, it must be approved by Ecosystem’s construction manager in writing. Your proposal shall indicate potential cases that are considered impractical to hold a competitive price. Cut in (x3) branch manual isolation valves in Gym Wing (locations to be detailed by Ecosystem) Drain and valve off all existing HW rads (hidden in cabinets) in Gym Wing Once all piping is installed, a pressure test shall be conducted at 1.5x the design pressure. This pressure test shall be done prior to insulation and must be observed and signed off by an Ecosystem representative as well as the foreman or project manager of the subcontractor. Any defective components will be replaced and shall not be priced in the scope of this RFP. Piping system shall be flushed and chemically treated using the hot water pumps in the boiler room until the suction guide strainer is proven clean. Provide support during equipment start-up Before construction, the contractor will provide shop drawings for the boiler room. After construction, the contractor shall provide as-built/redline drawings for all new hot water piping and existing piping converted from steam after construction completion. Control valves will be mechanically installed by contractor; however, control valves will be furnished by Ecosystem. Controls work by others. All demolished material shall be removed from site and disposed of legally.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents