Similar Projects
Last Updated | 02/25/2022 04:16 PM |
Project Title | Fuel Dispensing Station |
Physical Address | View project details and contacts |
City, State (County) | Little Egg Harbor, NJ 08087 (Ocean County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Fuel/Chemical Tanks and Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $100,000 to $250,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Background: The 177th Fighter Wing, Detachment 1, Warren Grove Gunnery Range has a requirement for the construction of concrete slabs for a Trans Cube Fuel Storage Tank and a Dispensing Station. This project will support the future installation of an above ground 5,000 gallon Trans Cube Fuel Storage Tank and Fuel Dispensing Station. The general scope of this project includes the construction of two (2) concrete fuel storage pads, a concrete fuel dispensing pad, traffic bollards, & electrical requirements. The scope of work for this project will require the contractor to provide and install all material, equipment, labor, & supervision required for a complete and useable system. Installation will include the pouring of two (2) adjacent concrete slabs for Fuel Storage Tank, construct a dispensing concrete pad, traffic bollards, & Electrical Requirements in accordance with the Scope of Work (SOW). This project is on a secure military facility. All personnel accessing the site will be required to submit personal information for a background investigation with the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) in accordance with AFI 10-245, AFI 31-101 and AFMAN 31-113. The Government reserves the right to limit access to the facility based on adverse results to the background investigation.All personnel accessing the military facility consent to search of their persons and property. Contract Award is expected in late August 2021.Period of Performance will begin as soon as practically possible. |
||||||||||||||
Details |
|
||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |