Similar Projects
Peninsula Bay - Master Plan
New Construction
Design
Cortez, FL 34210

North Point Development
New Construction, Build-Out - 36,538 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Stuart, FL 34994

Aluminum Dock
Bidding
Lake Alfred, FL

Tribute by Marriott
New Construction
Post-Bid
$12,000,000 est. value
Saint Augustine, FL 32080

M&R Waterfront Yankeetown, Yankeetown, Fl
Post-Bid
$25,000 to $100,000 est. value
Yankeetown, FL 34498

Design-Build Construction Delivery Method for New Fire Stations
New Construction - 17,250 SF
Results
Jacksonville, FL

Maurice Gibb Floating Docks
Results
Less than $600,000 est. value
Miami, Miami Beach, FL 33139

The Harbour in Historic Coconut Grove
New Construction, Renovation - 112,200 SF
Construction
$17,900,000 est. value
Coconut Grove, FL

North Cargo Berth 8 Extension
Construction
Less than $8,000,000 est. value
Cape Canaveral, FL 32920

M&R Waterfront St Pete, St Petersburg, FL
Post-Bid
$25,000 to $100,000 est. value
Saint Petersburg, FL

Dune Walkover 35S and 40 Rebuild
Results
Fernandina Beach, FL

Repair WEG Docks
Post-Bid
$1,000,000 to $5,000,000 est. value
Panama City, FL 32403

Sweeting Park Dock Replacement (P12278)
Results
Less than $65,000 est. value
Fort Lauderdale, FL 33311

Big Cypress BSS Facility Upgrades Dock Addition
Renovation
Post-Bid
Clewiston, FL 33440

Emeralda Marsh Observation Platform - Emeralda Marsh Conservation Area 3
Results
Less than $34,900 est. value
Palatka, FL

Reported 03/15/2019 12:00 AM
Project Title

Repair Waterfront at U.S. Coast Guard Station Cortez, FL

Physical Address View project details and contacts
City, State (County) Cortez, FL 34215   (Manatee County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description This project is to provide all labor, materials, tools, equipment and supervision necessary to maintain and renovate sections of the Main Pier (165 feet), Finger Pier (32 feet), "T" Pier (82 feet) and the Bulkhead (380 feet). The pier sub-structure is constructed from timber or concrete that has begun to degrade. To repair them the decking and timber super structure will be removed allowing the damaged concrete caps or timber piles to be repaired or demolished and replaced. New timber stringers and decking will be constructed and new electrical, lighting, water and fueling services will be installed. The floating piers will be removed and replaced with a concrete floating pier. Both floating docks and gangways will be removed and replaced. The davit pier will be removed and disposed of, as it is no longer needed. The bulkhead is constructed of encased riprap that has cracking and these cracks will be repaired. All work is located at U.S. Coast Guard Station Cortez, 4530 124th Street, Court West, Cortez, FL 34215.
Details
Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents