Similar Projects
Cottonwood Drive/Lanceleaf Street Traffic Signal - Town of Parker
Infrastructure
Conception
$600,000 CJ est. value
Parker, CO 80134

Cottonwood Drive/Lanceleaf Street Traffic Signal - Town of Parker
Infrastructure
Conception
$600,000 CJ est. value
Parker, CO 80134

Life Time Athletic Resort / Castle Pines
New Construction, Infrastructure - 115,000 SF
Design
$30,000,000 CJ est. value
Castle Pines, CO 80108

Life Time Athletic Resort / Castle Pines
New Construction, Infrastructure - 115,000 SF
Design
$30,000,000 CJ est. value
Castle Pines, CO 80108

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Mainstreet and Twenty Mile Road Intersection Improvements
Infrastructure
Post-Bid
CO 80138

CMGC services for the Crystal Valley Interchange Project
Renovation, Infrastructure
Results
Castle Rock, CO

2022 Asphalt Overlay Project
Infrastructure
Results
$5,289,227 est. value
Castle Rock, CO

Castle Pines Village Infrastructure
Infrastructure
Pending Verification
$4,000,000 CJ est. value
Castle Rock, CO 80108

Tall Tales Ranch / Lone Tree
New Construction, Infrastructure
Pending Verification
$5,400,000 CJ est. value
Parker, CO 80134

Lincoln Avenue Widening - Keystone to Parker Road - Town of Parker
Infrastructure
Conception
$21,000,000 CJ est. value
Parker, CO 80134

Millers Landing Hotel
New Construction, Infrastructure
Design
$89,500,000 CJ est. value
Castle Rock, CO 80104

RFQ Contractor - General Contractors
Infrastructure, Renovation
Post-Bid
$3,000,000 CJ est. value
Castle Rock, CO 80104

2022 Slurry Seal Project
Infrastructure
Results
$1,869,914 est. value
Castle Rock, CO

Ridgegate Southwest Village
New Construction, Infrastructure
Pending Verification
$440,000,000 CJ est. value
Lone Tree, CO 80134

Last Updated 07/18/2023 02:02 PM
Project Title

2023 Gravel Road Chip Seal Pilot Project

Physical Address View project details and contacts
City, State (County) Castle Rock, CO 80104   (Douglas County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Project Manager - 07/17/23
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the placement of approximately 74,688 square yards of double chip seal over existing gravel roads within the Black Forest Estates and Ponderosa East subdivisions of northeastern Douglas County. This process will create a hard travel surface that will assist with dust suppression and minimize road maintenance activities prior to the implementation of a future planned asphalt overlay project. All questions are due to Brian Schultz, Project Manager by 12:00 p.m. on Tuesday, August 1, 2023. The Bid Opening will be conducted at 3:00 p.m. on Tuesday, August 8, 2023, at the same address. The Project includes the following major items and approximate quantities: " 74,688 square yards of cover coat material (3/4 chip seal) " 74,688 square yards of cover coat material (3/8 chip seal) " 80,667 gallons of emulsified asphalt (chip seal) " 11,318 gallons of emulsified asphalt (fog seal) Prior to submitting a Bid Proposal, Bidders shall have received prequalification status (active status) with the Colorado Department of Transportation to bid on individual projects of the size and kind of work as set forth herein. Any questions on the bidding process shall be directed to Brian Schultz, Project Manager at 303.660.7490.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents