Similar Projects
Design-Build Pump Station B-4 Force Main P12567
New Construction
Results
Fort Lauderdale, FL 33301

Wastewater Lift Station 25
New Construction
Results
Less than $412,000 est. value
Deerfield Beach, FL 33441

Rehabilitation of Lift Station 22A, 21D, and New Force Main
Renovation, Infrastructure
Bidding
Coral Springs, FL

Replacement of Lift Station - 15
New Construction
Results
Pembroke Park, FL 33023

Submersible Lift Station Pumps
Renovation, Term Contract
Results
Pompano Beach, FL 33069

Sewer Lift Station Rehabilitation and Repair
Term Contract
Results
FL

S9 and S9a Trash Rake and Pump Station Refurbishments
Renovation
Results
Fort Lauderdale, Southwest Ranches, FL 33317

Tract 27 Booster Station Upgrades Project
Results
Less than $1,755,000 est. value
Tamarac, FL 33321

Lift Station No. 3 Replacement Project
Renovation
Results
$790,000 est. value
Plantation, FL 33324

Lift Station 14A Force Main Replacement
Renovation, Infrastructure
Results
Coral Springs, FL

Sewer Lift Stations Inspection and Testing
Renovation
Results
$15,000 est. value
Weston, FL

B-22 Pumping Station Replacement
Results
Fort Lauderdale, FL 33301

SW 130th Avenue Force Main and Lift Station 309 Improvements
Results
Davie, FL 33024

Sewage Lift Station Rehabilitation At Station Ft. Lauderdale
Renovation
Results
Dania Beach, Fort Lauderdale, FL 33004

Utility Analysis Zone 108
New Construction, Infrastructure
Post-Bid
$21,504,000 est. value
Pompano Beach, FL 33060

Last Updated 03/08/2022 10:38 AM
Project Title

Design-Build Pump Station A-16 Upgrade - Wastewater

Physical Address View project details and contacts
City, State (County) Fort Lauderdale, FL 33316   (Broward County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To provide design-build services for the design, permitting, construction, testing and startup of Pump Station A-16 Upgrade - Wastewater DCP. Construction of a new submersible duplex wastewater pump station with control panel and electrical service (Pump Station A-16) relocated to a site approximately 210 feet east of the SE 4th Avenue and SE 11th Street intersection on SE 11th Street. Construction of approximately 220 linear feet of new 18-inch PVC gravity sewer with new sanitary manholes from an existing sanitary sewer manhole located at the intersection of SE 4th Avenue and SE 11th Street to the new Pump Station A-16 location on SE 11th Street. Connection of the new 18-inch PVC gravity sewer piping at the proposed Pump Station A16 and with the existing manhole at the intersection of SE 4th Avenue and SE 11th Street as shown on the Conceptual Drawings. Construction of approximately 2,200 linear feet of new 12-inch HDPE force main from the new Pump Station A-16 on SE 11th Street to a connection point with the CITY’s existing 36- inch force main on SE 7th Street. As shown on the conceptual drawings, the proposed 12- inch force main route is along SE 11th Street, SE 3rd Avenue, SE 8th Street, and SE 4th Avenue. The 12-inch HDPE force main is proposed to be installed utilizing HDD methods, requires a subaqueous crossing where SE 3rd Street crosses Tarpon River, and includes approximately 170 linear feet of open cut, 12-inch C900 PVC pipe with DIP fittings at force main connections and bends. All costs associated with existing utility exploration, design development of the complete force main system including HDD and open cut plans and coordination as needed with the separate water related DBF are the responsibility of the DBF. Connection of the new 12-inch HDPE force main at the proposed Pump Station A-16 on SE 11th Street and with an existing 36-inch force main at the intersection of SE 4th Avenue and SE 7th Street as shown on the Conceptual Drawings

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents