Similar Projects
Last Updated | 03/08/2022 10:38 AM |
Project Title | Design-Build Pump Station A-16 Upgrade - Wastewater |
Physical Address | View project details and contacts |
City, State (County) | Fort Lauderdale, FL 33316 (Broward County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | To provide design-build services for the design, permitting, construction, testing and startup of Pump Station A-16 Upgrade - Wastewater DCP. Construction of a new submersible duplex wastewater pump station with control panel and electrical service (Pump Station A-16) relocated to a site approximately 210 feet east of the SE 4th Avenue and SE 11th Street intersection on SE 11th Street. Construction of approximately 220 linear feet of new 18-inch PVC gravity sewer with new sanitary manholes from an existing sanitary sewer manhole located at the intersection of SE 4th Avenue and SE 11th Street to the new Pump Station A-16 location on SE 11th Street. Connection of the new 18-inch PVC gravity sewer piping at the proposed Pump Station A16 and with the existing manhole at the intersection of SE 4th Avenue and SE 11th Street as shown on the Conceptual Drawings. Construction of approximately 2,200 linear feet of new 12-inch HDPE force main from the new Pump Station A-16 on SE 11th Street to a connection point with the CITY’s existing 36- inch force main on SE 7th Street. As shown on the conceptual drawings, the proposed 12- inch force main route is along SE 11th Street, SE 3rd Avenue, SE 8th Street, and SE 4th Avenue. The 12-inch HDPE force main is proposed to be installed utilizing HDD methods, requires a subaqueous crossing where SE 3rd Street crosses Tarpon River, and includes approximately 170 linear feet of open cut, 12-inch C900 PVC pipe with DIP fittings at force main connections and bends. All costs associated with existing utility exploration, design development of the complete force main system including HDD and open cut plans and coordination as needed with the separate water related DBF are the responsibility of the DBF. Connection of the new 12-inch HDPE force main at the proposed Pump Station A-16 on SE 11th Street and with an existing 36-inch force main at the intersection of SE 4th Avenue and SE 7th Street as shown on the Conceptual Drawings |
||||||||||||||||||
Details | Lift and Pump Stations, Renovation.
|
||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |