Similar Projects
Replace Roofing System RTI HQ 5222 - Sub Bids
Post-Bid
$1,800,000 est. value
Mashpee, MA 02649

Replace Roofing System Enlisted Barracks 5243 - Sub-Bids
Post-Bid
Less than $1,500,000 est. value
Mashpee, MA 02649

Split Ductless AC Repair and Relocation
Results
Woods Hole, MA

Fire Department Ventilation Upgrades Project - General Bids
Results
$370,000 est. value
Orleans, MA 02653

Air Vent Cleaning of Aviation Hangars
Post-Bid

CCCC Frank and Maureen Wilkens Science and Engineering Center - Sub-Bids
New Construction - 39,000 SF
Results
Less than $28,765 est. value
Barnstable, MA 02668

HVAC and Mechanical Products
Term Contract
Post-Bid

Owner's Project Manager for Replacement Heating Ventilation and Air Conditioning (HVAC) System for Yarmouth Police Station
Results
Yarmouth, MA 02673

Repair HVAC B5236
Post-Bid
Less than $510,000 est. value
Sandwich, MA 02542

Repair HVAC B5238
Results
$400,000 est. value
Sandwich, MA 02542

TTB Kelley HVAC Review
Post-Bid
Buzzards Bay, MA

Orleans Elementary School Rooftop Unit Replacement
Results
Orleans, MA 02653

Replacement of Heat Exchanger and Boiler COA at Yarmouth Senior Center
Post-Bid
Yarmouth, MA 02673

Flanagan Hall A/C Project - General Bids
Results
$250,203 est. value
Bourne, Buzzards Bay, MA 02532

On-Call Services for Various HVAC
Term Contract
Post-Bid
Less than $50,000 est. value
West Yarmouth, MA

Last Updated 04/20/2022 02:13 AM
Project Title

167-1 Replace A/C Condenser Units

Physical Address View project details and contacts
City, State (County) Harwich, MA   (Barnstable County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $34,900
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of: The Proposed HVAC system will be composed of (2) new aircooled condensing units with refrigerant piping to (2) new indoor air-handing units along with new thermostats for each system. New air indoor air-handling units will be equipped with hot water coils and connected to the heating hot water supply and return piping provided from the boiler located in the second-floor mechanical room. The new indoor air-handling unit will reconnect to existing supply and return ductwork to distribute heating and cooling throughout the building..

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents