Similar Projects
On Call Maintenance Paving
Results

2019 Asphalt Paving
Results
Rockport, ME

Town Paving Services
Results
Hope, ME

Pavement Milling, Cyclical Pavement Resurfacing, With Drainage Improvements
Results
Owls Head, Saint George, South Thomaston, Thomaston, ME

(LCP) Light Capital Paving
Results
Less than $580,000 est. value
ME

Striping Trucks - Electronic Pavement Marking Systems Maintenance and Repair/Statewide
Post-Bid

Warren Road Paving 2019
Results
Warren, ME

Crack Sealing/located in Region 2, on Routes 3, 137, 17, and 27
Results
Belmont, China, Dresden, Freedom, Liberty, Morrill, Palermo, Searsmont, Somerville, Washington, ME

Road Repair
Results
Cushing, ME

(LCP) Light Capital Paving and Profile Milling
Results
Alna, Bristol, Camden, Cushing, Friendship, Hope, Newcastle, Pittston, Rockland, South Bristol, South Thomaston, Thomaston, Union, Waldoboro, Warren, Washington, Whitefield, Wiscasset, ME 04841

(LCP) Light Capital Paving and Profile Milling
Results
$1,600,000 est. value

Stones Point Road Paving
Results
Cushing, ME

Pleasant Point Road Paving
Results
Cushing, ME

Highway Reconstruction and Bridge Culvert Replacements
Results
Camden, ME 04843

On Call Maintenance Paving/Located in Regions 1-5
Results

Last Updated 04/25/2019 09:08 AM
Project Title

Pavement Milling, Hot Mix Asphalt Overlay With Drainage and Safety Improvements

Physical Address View project details and contacts
City, State (County) Owls Head, Rockland, ME   (Knox County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Outline ofWork: PavementMilling, Hot Mix Asphalt Overlay with Drainage and Safety Improvements, and other incidental work. Location: In Knox County: Project 01879310 is on Route 73 in Owls Head, Replacing Catch Basin, Inlet & Outlet Pipes 0.05 miles southeast ofHarborside Terrace. Project NHPP-1879(400) is on Camden Street/Route 1 in Rockland, beginning at Maverick Street and extending northerly 0.86 of a mile to the Rockland/Rockport town line. Project NHPP-1879(410) is on US Route I in Rockland, Large Culvert Improvement 0.10 of a mile north ofWaldo Avenue. Project 2245800 is on US Route 1 in Rockland, beginning 0.10 of a mile northeast ofGlenwood Ave and extending northeasterly 1.22 miles to Park Drive.
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents