Similar Projects
RFQ Engineering - Renovate the Existing Wastewater Facility
Renovation, Infrastructure
Bidding
$600,000 CJ est. value
Etowah, AR 72442

RFP D/B - Solar Park I Project
New Construction, Infrastructure
Bidding
$9,000,000 CJ est. value
Lowell, AR 72745

Heber Springs Water and Sewer – WWTP Improvements
New Construction
Post-Bid
$7,000,000 est. value
Heber Springs, AR 72543

Wastewater System Improvements - Contract Section I (Collection System)
New Construction, Infrastructure
Post-Bid
Alpena, AR

Fourche Creek Water Reclamation Facility Fog Receiving Station and Digester Upgrades
Renovation
Results
Little Rock, AR 72206

North WWTP Levee Rehabilation
Renovation
Results
Atkins, AR

Wastewater System Improvements - Contract Section II (Wastewater Treatment Facility)
New Construction, Infrastructure
Post-Bid
Alpena, AR

Architectural Services
Infrastructure
Results
McCrory, AR

Faulkner Lake Clarifier Launder Cover Project
Renovation
Post-Bid
North Little Rock, AR

Construction of the Proposed Wastewater Treatment Facility Improvements
Renovation
Results
$2,520,000 est. value
Flippin, AR

Lost Bridge Village Treatment Facilities Improvements
New Construction
Post-Bid
$2,000,000 est. value
Garfield, AR

Hazen WWTP UV Replacement
Renovation
Results
Hazen, AR

Wastewater Rehabilitation Project
Renovation
Post-Bid
Heber Springs, AR

Emerson Wastewater Treatment Project
Renovation
Results
Emerson, AR

Construction of Improvements to Wastewater Treatment Plant
Renovation
Post-Bid
Heber Springs, AR

Last Updated 11/01/2022 07:31 PM
Project Title

Massard Improvements Aeration Basin - City of Fort Smith

Physical Address View project details and contacts
City, State (County) Fort Smith, AR 72904   (Sebastian County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $20,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Massard Improvements Aeration Basin This project is included in the City of Fort Smith's FY 2022-2031 Capital Improvement Plan (CIP). As of November 1, 2022, a design team has been identified. Design is anticipated to be done in 2022. Construction is anticipated from 2024 to 2026. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents