Similar Projects
Garden Ranch YMCA
Renovation
Design
Colorado Springs, CO 80918

Interquest Parkway Parking Lot
New Construction
Design
Colorado Springs, CO 80921

CO FTBR Crystal Dam (1), East Portal Access Road
Bidding
$4,500,000 to $5,500,000 est. value
CO

North Cheyenne Canon Powell Trailhead Parking Lot Construction
Bidding
Colorado Springs, CO

Fillmore North Mmt Route 6 Pedestrian and Transit Enhancements
Post-Bid
Colorado Springs, CO

Protective Coating and Pavement Maintenance
Post-Bid
$1,000,000 to $5,000,000 est. value
CO 80840

Construction of the McLaughlin / Old Meridian Roundabout Project
Results
$4,000,000 to $5,000,000 est. value
Colorado Springs, CO

US 24 and Meridian Road Improvements/Falcon Park and Ride Project
Results
$7,000,000 to $8,000,000 est. value
Colorado Springs, CO

UTE Valley Regional Trail Construction
Bidding
Colorado Springs, CO

On-Call & Ada Concrete
Post-Bid
Colorado Springs, CO 80503

Safety Improvements at the Intersection of SH94 and Peyton Highway
Results
$1,000,000 to $5,000,000 est. value
CO

Asphalt Crack Seal
Term Contract
Bidding
Colorado Springs, CO

Statewide Asphalt
Post-Bid

Van Buren Safe Routes to School Pedestrian and Bicycle Improvements
Results
Less than $500,000 est. value
Colorado Springs, CO 80903

2020 CDBG Prado Dr and Downtown ADA Improvements
Bidding
Fountain, CO 80817

Reported 07/21/2020 12:00 AM
Project Title

Falcon Highlands Maintenance Project

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO 80903   (El Paso County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide the Detailed requirements for construction. A. Remove and replace concrete sidewalk, curb and gutter and curb ramps. B. Hot mix asphalt patching and paving. C. Crack Sealing. D. Construction traffic control. E. Erosion control.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents