Similar Projects
Hardin Valley Academy 32 Classroom Addition - Knox County
Addition, Demolition, Infrastructure
Conception
$10,972,000 CJ est. value
Knoxville, TN 37932

Region 4 Indefinite Delivery/Indefinite Quantity (Idiq), Multiple Award Task Order Contracts (Matoc), For Construction Services In The States of Tennessee and Kentucky
New Construction
Design
$250,000 to $50,000,000 est. value

TCAT Tennessee College of Applied Technology Athens Cosmetology Renovation
Renovation
Design
$375,000 est. value
Knoxville, TN 37919

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Y-- (MATOC) for Design-Build Construction Services
New Construction, Renovation, Demolition
Post-Bid
$500,000 to $20,000,000 est. value

D/B Southeast MATOC - Phase 2
Results
$1,000,000 to $170,000,000 est. value

Construction Services Performed on AJW-242 Unstaffed Infrastructure Sustainment (UIS) Facilities On and Off Airport Operating Areas
Results
Less than $150,000,000 est. value

$160M LRD Metal Fabrication, Refurbishment, and Installation Multiple Award Task Order Contracts (MATOCS)
Renovation
Design
$5,000,000 to $20,000,000 est. value

Rapid Response Single Award Task Order Contract (SATOC)
New Construction
Post-Bid
Less than $95,000,000 est. value

SB Fuels Multiple Award Task Order Contract (MATOC)
Results
Less than $349,000,000 est. value
Washington, DC

Bass Building Renovation - University of Tennessee - Knoxville
Addition, Renovation
Design
$1,000,000 CJ est. value
Knoxville, TN 37920

ADA Compliance UTK and UTIA Elevator Upgrades
Renovation
Post-Bid
Knoxville, TN 37921

UTK Student Recreational Facilities Improvements
Renovation
Results
Knoxville, TN

Region 1 Boilers and HVAC Upgrades
Renovation
Design
$265,100 CJ est. value
Knoxville, TN 37914

UT Nursing Building - Surge Space - Bid Package No. 1
Renovation, Addition
Post-Bid
Knoxville, TN 37916

Last Updated 04/17/2023 06:06 PM
Project Title

UT Knoxville Audiology and Speech Pathology Phase II

Physical Address View project details and contacts
City, State (County) Knoxville, TN 37921   (Knox County)
Category(s) Education, Government/Public, Laboratory
Sub-Category(s) College/University, Laboratory, Misc. Buildings
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $10,400,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

This project will renovate a portion of the UT Conference Center in order to house the department of Audiology & Speech Pathology. The project will provide offices, clinic space, audiology research labs, pathology research labs, student work rooms, conference rooms, and observation space. A state of the art therapeutic playground for the children served at the clinics will also be provided. As of March 29th, 2023; this project is currently bidding for a general contractor. Written addenda will be issued based on questions submitted no later than seven (7) days prior to the bid date. Questions submitted after that date will be answered if considered essential to the Owner's interest. Scope of work and bid alternates were discussed. The Architect emphasized the following: A. Acoustical construction: 1. Large number of acoustical partitions. 6" batt insulation 2. Use of sound isolation clips. 3. Use of putty pads at all backboxes in partitions. 4. Sealing of acoustical partitions at top, bottom, intersections and all penetrations. B. Contractor requirement to coordinate with sound booth installation. Contractor performs ground penetrating radarsurvey, floorslab demolition, installation oflowered slabs atsound booth locations, floor infill at future sound booths, coordination of scheduling for sound booth delivery and installation, MEP services to sound booths, and trimout of installation. C. Windows. One replacement window bay is needed at second floor. This window will be changed to a curtain wall system from storefront to match the previous phase window construction. An illustrative shop drawing is attached for referenc

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Laboratory Furniture, Multiple Seating.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Insulation, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Fans, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents