Similar Projects
YMCA Expansion
Addition, Infrastructure
Conception
$1,000,000 CJ est. value
Sylvania, OH 43560

Universal Metals Expansion
Addition, Infrastructure - 75,000 SF
Conception
$40,300,000 CJ est. value
Toledo, OH 43611

Whiteford Center Road Apartments
New Construction, Infrastructure
Design
$12,100,000 CJ est. value
Toledo, OH 43613

West Central Avenue Apartments
New Construction, Infrastructure - 124,900 SF
Design
$34,000,000 CJ est. value
Toledo, OH 43606

IR 280/SR 65/SR 163 - Bridge Repair
Infrastructure
Bidding
$155,000 CJ est. value
Oregon, OH 43616

Maumee Bay Boardwalk Improvements - Ohio Department of Natural Resources
Infrastructure
Post-Bid
$5,700,000 CJ est. value
Oregon, OH 43616

Construct Sanitary Sewer No. 929, Angola Road, Springfield Township
Infrastructure
Post-Bid
$200,000 CJ est. value
Toledo, OH 43604

Underground Utility Infrastructure Upgrades
Infrastructure
Results
$182,940 CJ est. value
Toledo, OH 43606

Component 2: Reconstruction of Dock Face Phase 3 - Rebid
Infrastructure
Results
$11,310,000 CJ est. value
Toledo, OH 43605

Construction Management at Risk Services RFQ - Parking Lot Project 2021
Construction
$8,000,000 est. value
Toledo, OH 43609

Bridge Ramp Replacement 2022
Demolition, New Construction, Infrastructure
Construction
$2,149,941 CJ est. value
Toledo, OH 43609

Street Resurfacing and Reconstruction - Toledo
Infrastructure
Pending Verification
$5,440,000 CJ est. value
Toledo, OH 43604

Nature's Nursery Wildlife Rehabilitation Center
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Whitehouse, OH 43571

Vitalia Senior Living Sylvania
New Construction, Infrastructure
Conception
$60,600,000 CJ est. value
Sylvania Township, OH 43617

Irwin Road Chip Seal Work
Infrastructure
Design
$50,000 CJ est. value
Toledo, OH 43620

Last Updated 07/12/2023 12:42 PM
Project Title

Collins Park Water Treatment Plant Lagoon Dam Overflow Modifications

Physical Address View project details and contacts
City, State (County) Toledo, OH 43605   (Lucas County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $487,850 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Bid Valid:120 days Liquidated Damages: $500.00 Project Duration:6 Months Concrete cutting of holes in Lagoon Overflow structures. Excavation of lagoon embankment to install a concrete pipe overflow. Addition of a concrete spill way from lagoon to Otter Creek. Install Trash Racks, Staff Gauges, Excavation work Type of Award: Lump Sum In order to be responsive, all bids must have the following with submittal: Project Paperwork Line Items - will auto-populate with e-bid Bid Guaranty (bid bond or certified check / cashiers check on a solvent bank) Signed Contract by the Vendor Child Support Affidavit Bureau of Workers Compensation Certificate Tax Exemption Certificate Insurance Certificate, naming the City of Toledo as an additional insurer - requirements are available on the Documents tab of this bid in If using a check as the bid guaranty, the check must be scanned and uploaded with your bid. In addition, the check must be received by the Division of Purchases and Supplies no later than the due date and time to be deemed responsive. No Company / No Personal checks will be accepted. Checks shall be made payable to City of Toledo. If your company does not provide a bid guaranty, your bid submittal will be deemed non-responsive. (TMC 187.09) Online Q&A: Yes Q&A Deadline: 05/24/2023 12:00 PM (EDT) City forms must be filled out and attached to the bid: Project Paperwork (Acknowledgment and Acceptance of Conditions Contract Specifications; Toledo Municipal Income Tax Compliance; Public Utilities Compliance; MBE Good Faith and Goal Commitment; EEO Form; Primary and Subcontractor Forms and Debarment and Suspension Certificate; Best Bid Criteria); Signed Contract by Vendor CEO/President; Current Workers Compensation Certificate; Insurance Certificate listing the city of Toledo as an additional insurer; Child Support Affidavit; and Tax Exemption Certificate. The following items will be required upon awarding the contract: Performance Bond and PLA, if applicable. Prevailing Wages are required for this project. It is the obligation of a contractor or subcontractor to make payment in accordance with the prevailing wage determinations.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents