Similar Projects
Opus Area Improvements Phase 3
New Construction, Infrastructure
Bidding
Minnetonka, MN

Opus Area Improvements Phase 3
New Construction, Infrastructure
Bidding
Minnetonka, MN

2021 Street Maintenance
Post-Bid
Saint Louis Park, MN

Plymouth Avenue North Reconstruction
Post-Bid
Minneapolis, MN 55400

Vincent Avenue North Sanitary and Storm Sewer
Renovation
Results
Minneapolis, MN 55401

Meter Station M228A, Interceptor 7015C, and L35 Repair
Renovation, Addition
Results
Brooklyn Park, Maple Grove, MN 55101

2022 Street and Utility Improvement Project
Infrastructure
Bidding
$2,030,000 est. value
Saint Anthony, MN

Hot Poured Joint Sealer
Term Contract
Post-Bid
Minneapolis, MN

Zachary Lane Elementary School - 2021 LTFM
Renovation
Results
Less than $1,200,000 est. value
Minneapolis, MN 55442

Hot Mix Asphalt
Infrastructure
Bidding
Minneapolis, MN

Ductile Iron Pipe
Term Contract
Post-Bid
Minneapolis, MN

Medina Country Club Sewer Rehabilitation
Results
$108,000 est. value
Medina, MN 55340

2022 Street Improvements
Infrastructure
Bidding
Orono, MN

Grandview South Area Street and Utility Improvements Improvement
Post-Bid
$9,000,000 to $10,000,000 est. value
Brooklyn Center, MN

2021 Micro Surfacing and Chip Seal
Results
Champlin, Independence, Maple Grove, Minnetrista, MN

Last Updated 01/28/2022 07:44 AM
Project Title

2022 Neighborhood Street Reconstruction

Physical Address View project details and contacts
City, State (County) Brooklyn Center, MN   (Hennepin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,677,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

27 EACH Remove water service 12635 SY Remove Bituminous Pavement Roadway 16265 CY Common Excavation 4000 CY Subgrade Excavation 2782 TON Type SP9.5 Wearing Course Mix (3,C) 1731 LF 8" PVC Watermain 892 LF RCP Storm Sewer CL V (15"&18") 8668 SY Sodding Type Lawn

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents