Similar Projects
Last Updated | 03/17/2023 06:05 AM |
Project Title | Pow Wow Ground Access Culvert Replacement |
Physical Address | View project details and contacts |
City, State (County) | Wakeshma Township, MI 49052 (Kalamazoo County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $313,805 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | For Pow Wow Ground Access Culvert Replacement The work for which bids are being requested consists of the following: Removal of existing CMP culvert and installation of new concrete 38 foot long 10 ft x 6 ft box culvert and including: grading and paving of access drive and walking path, along with associated drainage improvements and bank stabilization, and other appurtenances. Any project-related questions can be directed to Suzannah Deneau (sdeneau@gowightman.com), (269) 487-9717 A certified check or bank draft drawn on a solvent bank in the State of Michigan payable without condition to the OWNER or a satisfactory bid bond. No bids may be withdrawn after the opening of the bids for a period of sixty (60) days. The successful bidder will be required to furnish a satisfactory assurance. The Nottawaseppi Huron Band of the Potawatomi reserves the right to reject any or all bids and to waive any irregularities and informalities in bidding. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |