Last Updated 04/19/2021 03:17 AM
Project Title

Southcrest-Ferndale Area Pavement Rehabilitation

Physical Address View project details and contacts
City, State (County) Maplewood, MN   (Ramsey County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project will include the following approximate quantities: 10,300 TON Bituminous Base Wear Course Mixture 10,650 LF Bituminous Road Pavement Saw Seal 46,650 SY Full Depth Reclamation 4,650 LF Concrete Curb and Gutter 1,550 SY Turf Establishment 60 LF Storm Sewer Pipe 3 EA Storm Sewer Structures 54 EA Furnish Install/Adjust Existing Storm Sewer Castings 65 EA Furnish Install/Adjust Existing Sanitary Sewer Castings 34 EA Rehabilitate Existing Storm Sewer Adjustment Rings (Flex Seal Utility Sealant) 66 EA Adjust/Repair/Replace Water Valve Box in Street 9,100 LF 4-Inch Epoxy Pavement Markings, Single/Double Solid Line (Bid Alternate No. 1) 3,600 LF 8-Inch Sanitary Sewer Pipe Lining (Bid Alternate No. 2)

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents