Similar Projects
127Eas22r0006 Placerville Nursery Cooler & Freezer Upgrade
Term Contract
Design
$500,000 to $1,000,000 est. value
Camino, CA

Scheduled Inspection And Maintenance Services, And Non-Scheduled Repair Services For Two (2) Kelly Mechanical Dock Levelers
Renovation, Alteration
Post-Bid
$28,000 est. value
Sacramento, CA 95818

Roughing Filter Surface Wash System Rehabilitation Services - Rector Reservoir
Alteration
Post-Bid
Napa, CA 94558

7320--Meal Tray System Replacement
Term Contract
Results
Livermore, Menlo Park, Palo Alto, CA

7320--Meal Tray System Replacement
Term Contract
Results
Livermore, Menlo Park, Palo Alto, CA

Kubota B26yl Landscape Tractor
Alteration
Post-Bid
Los Gatos, CA

Glen Avon Elementary School Sitework
Renovation, Infrastructure, Alteration
Results
$1,300,000 est. value
Riverside, CA 92509

Coffing Electrical Wire Hoists
Term Contract, Alteration
Post-Bid
Sacramento, CA 95822

Victorville Water District Meter Endpoints
Alteration
Results
Victorville, CA

Waste Water Pump Equipment Maintenance and Repair Services
Alteration
Post-Bid
$200,000 est. value
Corcoran, CA 93212

Base Theater Tech Upgrade
Alteration
Results
Edwards Air Force Base, CA

North Area Recovery Station Replacement Equipment Lift
Alteration
Post-Bid
$105,000 est. value
North Highlands, CA 95660

Kitchen/Cafeteria Building (Increment 1) at Weed Elementary School Rough Framing Materials
Alteration
Results
Weed, CA 960942

Commercial Washer and Dryer Installation
Alteration
Post-Bid
Hanford, CA 93230

Electrical Materials Pad Mounted Switches
Alteration
Results
Anaheim, CA

Last Updated 05/09/2023 05:33 PM
Project Title

Main Wastewater Treatment Plant Secondary Clarifier Rehabilitation Phase 3

Physical Address View project details and contacts
City, State (County) Oakland, CA 94607   (Alameda County)
Category(s) Single Trades
Sub-Category(s) Equipment
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $7,898,951 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes: (1) Rehabilitating Clarifiers 4 and 7 by replacing the clarifier equipment, refurbishing the bridge, resurfacing the concrete surfaces, rebuilding drives, and replacing electrical equipment, (2) installing new sump pits in Clarifiers 3, 4, 7, 10 and 11, (3) installing new sump pumps in Clarifiers 1, 3, 4, 7, 10 and 11, (4) installing safety access gates on the Clarifiers 1-7 and 9-11 railings, (5) replacing light pole lighting with LEDs and new wiring, (6) providing new 120V, 208V, and 480V and control wiring for Clarifiers 1-7 and 9-10, (7) providing and installing new signal wiring for the flow meters for Clarifiers 1-12, and (8) inspecting clarifier return activated sludge pipeline and providing Cure-In-Place Piping rehabilitation if required. Estimated Cost: $5,600,000 to $8,400,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 11 - Equipment, Operation and Maintenance of Equipment, Vehicle Service Equipment, Maintenance Equipment, Unit Kitchens, Residential Equipment, Residential Appliances, Agricultural Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents