Last Updated 02/13/2020 09:45 AM
Project Title

CO FTNP ROMO 11(4) Beaver Meadows Road

Physical Address View project details and contacts
City, State (County) Estes Park, CO   (Larimer County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000 to $7,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

PROJECT DESCRIPTION: This project provides 3R rehabilitation treatment for routes to include 4.85 miles of Beaver Meadows roadway within Rocky Mountain National Park. The project will also be lengthening and adding a FAST lane at Beaver Meadows Entrance Station which is approximately 1,400 feet. The project consists of pulverizing the existing asphalt for additional base, concrete curb, drainage improvements, and repaving with approximately 4” of asphalt. The project will grade side slopes due to additional pavement thickness along shoulders. Pullouts directly adjacent to the roadway will also be treated and repaved as part of the project. SIGNIFICANT QUANTITIES: Significant Items for Schedule A include: 250 LNFT of Standard Underdrain, 1.8 MILES of Full Depth Reclamation 8-Inch Depth of Existing Pavement, 10,750 TONS of Hot Asphalt Concrete Paving, 2,550 LNFT of 14-Inch Colored Concrete Curb and Gutter, 1,200 CUYD of Roadway Excavation, and 100 CUYD of Subexcavation. Significant Items for Option W include: 0.5 MILES of Full Depth Reclamation 8-Inch Depth of Existing Pavement, 4,350 TONS of Hot Asphalt Concrete Paving, 3,050 LNFT of 12-Inch Colored Concrete Curb and Gutter, 1,500 LNFT of 14-Inch Colored Concrete Curb and Gutter, 1,500 CUYD of Roadway Excavation, and 400 CUYD of Subexcavation. Significant Items for Option X include: 0.9 MILES of Full Depth Reclamation 8-Inch Depth of Existing Pavement, 5,200 TONS of Hot Asphalt Concrete Paving, 270 LNFT of 14-Inch Mountable Colored Concrete Curb and Gutter, 1,200 LNFT of 14-Inch Colored Concrete Curb and Gutter, 100 CUYD of Roadway Excavation, and 100 CUYD of Subexcavation. Significant Items for Option Y include: 120 LNFT of Curb and Gutter Removal and Installation, 650 SQYD of Asphalt Patch, and 160 LNFT of Standard Underdrain.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents