Similar Projects
New Water Treatment System
Term Contract, Alteration
Design
$25,000 to $100,000 est. value
Waldport, OR

EOCI D-South HVAC Upgrades
Term Contract
Bidding
$400,000 to $500,000 est. value
Pendleton, OR 97801

Nancy Ryles Elementary School HVAC Upgrades
Alteration
Bidding
$400,000 est. value
Beaverton, OR 97007

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC Filters, Installation and Coil Cleaning Services
Alteration
Results
$245,000 est. value
Hillsboro, OR

Pioneer Hall AC Replacement
Alteration
Results
$251,293 est. value
Bend, OR 97703

McNary Dam Powerhouse HVAC Controller Repair
Alteration
Bidding
$500,000 est. value
Umatilla, OR 97882

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Linn-Benton Community College Main Campus Takena Remodel Project
Alteration
Results
Albany, OR 97321

Public Safety Training Center Makeup-Air Units (MAU) and Exhaust Replacement
Alteration
Bidding
$650,000 est. value
Clackamas, OR 97015

Residential HVAC Contractors
Term Contract
Post-Bid
OR

Design-Build for Mechanical or HVAC
Alteration
Results
Springfield, OR 97477

HVAC Equipment Replacement
Alteration
Bidding
$25,000 to $50,000 est. value
Kimberly, OR 97848

Medford School District MSDEC Annex HVAC Upgrades
Renovation
Post-Bid
Medford, OR 97501

Last Updated 05/27/2022 02:55 AM
Project Title

Ashland Library HVAC Equipment Upgrade

Physical Address View project details and contacts
City, State (County) Ashland, OR 97520   (Jackson County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The objective of this project is to replace aged HVAC equipment at the Ashland branch Library. The Ashland library constructed 1912 and remodeled and expanded in 2001 and is located near down-town Ashland. The building relies on a water source heat pump system utilizing 2 boilers and one cooling tower. There are a total of 13 heat pumps located throughout the facility’s 3 levels.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents