Similar Projects
Museum and Art Center
New Construction, Renovation - 59,000 SF
Design
$30,000,000 est. value
Brattleboro, VT 467274

Slate Valley Walking Trail
New Construction - 3,600 SF
Design
Less than $15,000 est. value
Poultney, VT 05764

BGS - Seymour Lane Bridge Replacement
Bidding
Newport, VT 05855

Pearl Street Sidewalk Reconstruction
Bidding
Johnson, VT 05656

Slip Formed Concrete Curbing 2020
Post-Bid
Rutland, VT

IQ004 Indefinite Delivery / Indefinite Quantity Primary Contracts –Contractor On-Ramp
Post-Bid
Montpelier, VT 05633

Milton STP BP16(10) (US Route. 7 Gap Project)
Results
$970,995 est. value
Essex Junction, VT

Putney STP Deck (38)
Results
$500,000 to $1,000,000 est. value
Putney, VT 05346

Fort Hill Bridge Removal, Stream Restoration and Route 15 Wildlife Passage Project
Construction
Less than $141,902 est. value
Williston, VT 05495

Manchester VTRY (28) and Manchester VTRY (29)
Bidding
Less than $250,000 est. value
Manchester, VT

Sidewalk to Missisquoi Valley Union High School Swanton STP BP19(5)
Post-Bid
Swanton, VT

Sidewalk Replacement Fair Haven Rest Area
Results
Fair Haven, VT

Waterville Elementary School Parking Lot Resurfacing
Bidding
Waterville, VT 05492

Lyndon Town School Sidewalks
Post-Bid
Lyndonville, VT 05851

West Rutland Sidewalk Segments STP BP15(1)
Results
$500,000 to $1,000,000 est. value
West Rutland, VT 05777

Reported 06/13/2020 12:00 AM
Project Title

STP CVRT(2) - Winooski River Bridge and Bike Path Construction

Physical Address View project details and contacts
City, State (County) Montpelier, VT   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Cross Vermont Trail Association is requesting sealed bid proposals from pre-qualified contractors for construction of STP CVRT(2) "Phase 3"; generally described as construction of a new 200 foot bicycle/pedestrian bridge over the Winooski River and 600 feet of Shared Use Path. Project is located between and adjacent to Powerplant Road in East Montpelier and US RT 2 in Berlin.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents