Similar Projects
Sawmill Mixed Use Future Phases
New Construction, Infrastructure
Conception
$200,000,000 CJ est. value
Summerville, SC 29483

Sawmill Mixed Use Future Phases
New Construction, Infrastructure
Conception
$200,000,000 CJ est. value
Summerville, SC 29483

Downtown Nexton Mixed-Use
New Construction, Infrastructure - 310,000 SF
Design
$100,000,000 CJ est. value
Summerville, SC 29483

SafeNest Storage
New Construction, Infrastructure - 113,400 SF
Design
$12,200,000 CJ est. value
Summerville, SC 29483

Synthetic Turf for High School Fields
Infrastructure
Bidding
$2,000,000 CJ est. value
Summerville, SC 29483

RFQ D/B - I-26 at I-95 Interchange Improvement
Infrastructure
Bidding
$2,000,000 CJ est. value
Saint George, SC 29477

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Harris Teeter Fuel Center #355 / Summerville
Demolition, New Construction, Infrastructure, Renovation
Post-Bid
$800,000 CJ est. value
Summerville, SC 29485

Rehabilitation - S-174 Dorchester Co
Infrastructure
Results
SC

Safety Improvements - District 6
Infrastructure
Results

The Ponds - Phase 6
New Construction, Infrastructure
Construction
$66,000,000 CJ est. value
Summerville, SC 29483

BID Group Wood Processing Expansion
Addition, Demolition, Infrastructure
Pending Verification
$10,600,000 CJ est. value
Saint George, SC 29477

Limehouse Drive/Multi-Residential
New Construction, Infrastructure
Pending Verification
$18,000,000 CJ est. value
Summerville, SC 29485

Intersection Improvement S-169 (Von Ohsen Rd)/S-881 (Lincolnville Rd)
Infrastructure
Conception
$2,100,000 CJ est. value
Summerville, SC 29485

Rangewater North Maple Street
New Construction, Infrastructure
Design
$65,000,000 CJ est. value
Summerville, SC 29483

Last Updated 01/14/2023 01:31 AM
Project Title

North Maple Extension Project - Re-Bid

Physical Address View project details and contacts
City, State (County) Summerville, SC 29483   (Dorchester County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $21,089,225 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Town of Summerville reserves the right to waive any informalities in bidding and to reject all Bids if it is in the Town's best interest to do so. Unless all bids are rejected, award will be made by the Town of Summerville. All questions in connection with this bid shall be directed to the Town of Summerville Representative: Scott McDonald at SMcdonald@summervillesc.gov or 843-695-6508. North Maple Street Extension Project The work includes grading, drainage, and paving for S-59 (Parsons Road), S-131 (North Maple Street), S-65 (W Richardson Avenue, and US 78 (W 5 th N Street). Work also includes the relocation of S-59 (Parsons Road), pavement markings, signing, and traffic control for the entire project, and street lighting along S-131 (North Maple Street). The project also includes traffic signal installation, incontract sewer line relocation, railroad and utility coordination. The total estimated roadway length of the project is approximately 2.22 miles

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents