Similar Projects
Rancho Coronado Park improvements
Renovation
Post-Bid
$1,100,000 est. value
San Marcos, CA 92078

City Facilities General Maintenance and Repair - Wood 2021-2022
Renovation, Term Contract
Results
Poway, CA 92064

NFC Fitness Court Install at Washington Park
New Construction
Results
$85,000 to $95,000 est. value
Escondido, CA 92027

MLK Recreation Center Moisture Intrusion
Renovation, Alteration
Results
$916,000 est. value
San Diego, CA 92101

Construction Management Services for the Collier Park Renovation Project, Phase 2
Renovation
Post-Bid
$3,500,000 est. value
La Mesa, CA 91941

Hickman Field Athletic Area
New Construction
Post-Bid
$7,211,000 est. value
San Diego, CA 92101

Weston Park Improvements Playground Installation
Renovation
Results
$250,000 est. value
Santee, CA

Tennis Court Resurfacing Project
Renovation
Results
$200,000 est. value
Del Mar, CA 92014

Wells Park Improvements - Basketball Courts
Renovation
Bidding
$180,000 est. value
El Cajon, CA 92021

Skyline Backstop Upgrades
Renovation
Post-Bid
Solana Beach, CA 92075

Prince Memorial Skatepark Improvements
Renovation
Bidding
$180,000 to $220,000 est. value
Oceanside, CA 92058

Clay Avenue Mini Park
Renovation
Results
$825,900 est. value
San Diego, CA 92101

Palomar Mountain State Park
Renovation, Term Contract
Results
CA

Collier Park Renovation Project Phase 2
Renovation
Results
$3,000,000 est. value
La Mesa, CA 91941

Bluff Top Park Trail Improvements
Renovation
Results
$1,300,000 est. value
San Diego, CA 92104

Last Updated 06/23/2022 07:28 AM
Project Title

Salk Neighborhood Park Joint Use Facility

Physical Address View project details and contacts
City, State (County) San Diego, CA 92126   (San Diego County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $6,450,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work, paving, outdoor lighting and renovation of a mixed-use development in San Diego, California. Completed plans call for the renovation of a playground / park / athletic field; for site work for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; and for outdoor lighting for a sidewalk / parking lot.Park improvements to include a comfort station, new pedestrian access from the public right of way, paving area, entry monument wall, retaining wall, multi-use fields, security lighting, shades structures, walkways retaining walls, landscape, bioretention basins, adult fitness equipment, parking lot, enhanced furnishings including; benches, trash/recycle receptacles, bike racks, drinking fountain, fencing, improvements to the existing dog park at Maddox Park and shade structure at Maddox Park. Online Q&A No 1.1. The Work shall be performed in accordance with: 1.1.1. The Notice Inviting Bids and Plans numbered 41245-01-D through 41245-106-D, inclusive. Other Details Contractor and Subcontractor Registration Requirements. This project is subject to compliance monitoring and enforcement by the DIR. A contractor or subcontractor shall not be qualified to bid on, be listed in a bid or proposal, subject to the requirements of section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, unless currently registered and qualified to perform public work pursuant to Labor Code section 1725.5 It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded. 1.9.1. A Contractor's inadvertent error in listing a subcontractor who is not registered pursuant to Labor Code section 1725.5 in response to a solicitation shall not be grounds for filing a bid protest or grounds for considering the bid non-responsive provided that any of the following apply: (1) the subcontractor is registered prior to bid opening; (2) within twenty-four hours after the bid opening, the subcontractor is registered and has paid the penalty registration fee specified in Labor Code section 1725.5; or (3) the subcontractor is replaced by another registered subcontractor pursuant to Public Contract Code section 4107. 1.9.2. By submitting a bid or proposal to the City, Contractor is certifying that he or she has verified that all subcontractors used on this public work project are registered with the DIR in compliance with Labor Code sections 1771.1 and 1725.5, and Contractor shall provide proof of registration for themselves and all listed subcontractors to the City at the time of bid or proposal due date or upon request. Notes Subcontracting participation percentages apply to this contract. 7.1. The City has incorporated mandatory SLBE-ELBE subcontractor participation percentages to enhance competition and maximize subcontracting opportunities. For the purpose of achieving the mandatory subcontractor participation percentages, a recommended breakdown of the SLBE and ELBE subcontractor participation percentages based upon certified SLBE and ELBE firms has also been provided to achieve the mandatory subcontractor participation percentages: 1. SLBE participation 6.2% 2. ELBE participation 9.2% 3. Total mandatory participation 15.4% 7.2. The Bid may be declared non-responsive if the Bidder fails to meet the following requirements: 7.2.1. Include SLBE-ELBE certified subcontractors at the overall mandatory participation percentage identified in this document; OR 7.2.2. Submit Good Faith Effort (GFE) documentation, saved in searchable Portable Document Format (PDF), demonstrating the Bidder made a good faith effort to conduct outreach to and include SLBE-ELBE Subcontractors as required in this solicitation by 5 PM, 3 Working Days after the Bid opening if the overall mandatory participation percentage is not met. All submittals in searchable PDF shall be submitted electronically within the prescribed time identified in the contract documents via PlanetBids by invitation to the point of contact named in the bid provided by the Contract Specialist to all bidders. This contract will be subject to the following: - the citys subcontracting participation requirements for slbe program - prevailing wage rates: state - apprenticeship Bid Valid 120 Calendar Days Liquidated Damages $1,000 Per Day Estimated Bid Value $6,450,000.00 Start/Delivery Date Project Duration 311 Working Days 173-109E

Details

Park/Playground, Renovation.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents