Similar Projects
Heatherfield Roof Replacements
Renovation, Alteration
Design
Glenview, IL 60025

Heating, Ventilation, Air Conditioning (HVAC) and Utility Control Systems at Chicago O'Hare International Airport
Alteration
Bidding
$200,000 est. value
Chicago, IL 60666

2023 Roofing and Masonry Upgrades Oak Park and River Forest High School
Alteration
Bidding
$182,000 est. value
Oak Park, IL 60302

Lincoln Elementary School Bid Package 5 Steel- SD99 HVAC Priority 1 Work and Repairs
Alteration
Sub-Bidding
$100,000 est. value
Cicero, IL 60804

HVAC and Mechanical Products
Term Contract
Post-Bid

Upgrade Mechanical Systems
Post-Bid
Less than $250,000 est. value
River Grove, IL 60171

Roof Replacement at Chippewa School
Results
Palos Heights, IL 60463

Replacement of Rotunda Air Handling Units
Results
Chicago, IL

Building Automation Systems-Flannery
Term Contract
Post-Bid
$250,000 est. value
Chicago, IL 60612

2021 Roofing Work at Various Schools
Results
Buffalo Grove, Elk Grove Village, Rolling Meadows, IL 60089

Classroom Air Conditioning and Electrical Renovations
Renovation
Post-Bid
IL

2021 Roof Replacement
Results
Wheeling, IL 60090

2021 Roof Repairs at MAC Arthur Middle School
Post-Bid
Prospect Heights, IL 60070

UIC Daley Library Roof Replacement
Renovation
Results
Chicago, IL 60607

Carpenter ES 2021 HVAC Replacement And Remodel
Post-Bid
Park Ridge, IL 60068

Last Updated 07/10/2022 11:54 PM
Project Title

Bone Marrow Fan Replacement - Divisions 03, 04, 05

Physical Address View project details and contacts
City, State (County) Chicago, IL 60612   (Cook County)
Category(s) Single Trades
Sub-Category(s) HVAC, Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of replacing RTU-1, 6,000 CFM roof top unit and controls for the system. Removal of Exhaust fan, EF-1, approx. 5500 CFM that serves isolation suite 882WA. Steam heating will be replaced with hot water and coil pump for new preheat coil. Chilled water will be existing campus chilled water system with a new 2 way control valve to AHU cooling coil. Demolition of the two existing chilled water booster inline pumps. Humidification will connect to existing campus steam piping. The new indoor air handling unit shall be located behind the exterior wall immediately South of Bone Marrow AHU, in the mechanical equipment room on the 9th floor. A new corresponding Exhaust Fan (EF-1) Unit will be installed on the roof, adjacent to the existing unit RTU- 1/EF-1 exhaust roof penetration. o minimize the air service interruption for Bone marrow suite a new supply air ductwork shall be run from the existing S-9 Supply air ductwork over the area where the new AHU shall be placed and penetrate the exterior wall and connect to the existing Supply ductwork above the roof but below the RTU-1. Replace fourteen (14) Air Terminal box damper actuators from Pneumatic to DDC electronic and the associated hot water reheat control valves from Pneumatic to DDC electronic and the associated space pneumatic space temperature sensor to DDC. Replace the Tridium VYKON Jace-600 controller in penthouse located near door out to the lower roof. Replace the existing Room Pressure Control/Monitoring Panel which has 11 room pressure keyed switches and Pressura room pressure monitors showing the room pressure status and replace this with a touch screen monitor to duplicate this with all DDC control.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents