Similar Projects
Maple Grove Middle School
New Construction
Post-Bid
Mapleton, UT 84664

Spanish Fork High School Rebuild
Post-Bid
Spanish Fork, UT 84660

Payson High School Rebuild and Maple Mountain High School Football Stadium and Track Renovation
Results
$90,000,000 est. value
Payson, UT 84651

Usdb Springville Campus Portable Classroom Remodel
Renovation
Results
Less than $75,000 est. value
Springville, UT 84663

Mountain Sunrise Academy Charter School
New Construction - 40,096 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Saratoga Springs, UT 84043

New Middle School for Alpine School District
New Construction
Construction
Less than $41,000,000 est. value
Lehi, UT 84043

Micron Middle School Seminary
New Construction
Pending Verification
Lehi, UT 84043

Timpview High School Replacement
New Construction, Demolition - 400,000 SF
Post-Bid
$115,000,000 est. value
Provo, UT 84604

Cedar Valley High School - Site Modification and Asphalt for Modular Building
New Construction
Results
Eagle Mountain, UT 84005

Spring Canyon Middle School
Construction
Springville, UT 84663

ASD Micron Middle School 435
Post-Bid
Lehi, UT 84043

Bingham High Remodel - Phase III - Part II
Renovation
Results
South Jordan, UT

American Heritage Phase 1C And 2A
New Construction - 86,128 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
American Fork, UT 84003

Spanish Fork High School Bid Package 1
Post-Bid
Spanish Fork, UT 84660

Construction Manager/General Contractor for Polaris High School and Summit Programs Remodel
Renovation
Results
$1 to $4,500,000 est. value
American Fork, UT 84003

Last Updated 07/21/2020 05:54 PM
Project Title

CM/GC Mountain View High Diesel Mechanics Shop Remodel

Physical Address View project details and contacts
City, State (County) Orem, UT 84057   (Utah County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project will consist of the remodel/renovation of the existing woodshop, woodshop classroom, and woodshop storage room. These spaces will be converted into a new diesel mechanics shop, diesel mechanics classroom, and diesel mechanics training room. The remodeled/renovated area is approximately 5400 square feet. This project will also include the re-work and widening of the access gate and drive approach to the shop yard area.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents