Similar Projects
Last Updated | 04/13/2022 03:36 PM |
Project Title | DLA Aviation Operations Center, Phase II, Defense Supply Center Richmond (DSCR) |
Physical Address | View project details and contacts |
City, State (County) | Richmond, VA 23225 (Chesterfield County) |
Category(s) | Commercial |
Sub-Category(s) | Office |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $25,000,000 to $100,000,000 |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project Description: The DLA Aviation Operations Center Phase II project requirements will construct a multi-story office building of 281,075 SF to accommodate 1,622 employees in an administrative operations center. The Operations Center includes the following: open and individual administrative office and support areas (e.g., mail distribution, packing and shipping spaces, reception space, reproduction area, unclassified conference and Video Tele-Conference (VTC) space, law library, kitchenette/break, restrooms, storage, equipment and supply rooms, passenger and service elevators), lightning protection, fire suppression, fire alarm, mass notification systems, Intrusion Detection System (IDS) and energy management control system (EMCS), and building information systems. The project will utilize conventional design and construction methods to accommodate the mission of the facility. The facility will be compatible with the Department of Defense (DoD), DLA, and Defense Supply Center, Richmond design standards. Local material and construction techniques will be used where cost effective. The facility will be designed as a permanent construction in accordance with DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. The project will comply with DoD minimum Antiterrorism Standards for buildings per UFC 4-010-01. The project also includes emergency generators, site improvements, special foundations, parking and all necessary supporting facilities. |
||||||||||||||||||||||||||||||||||||
Details | Office, 281,075 SF New Construction.
|
||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |