Similar Projects
Last Updated | 02/28/2023 05:18 PM |
Project Title | WC Devices 2022 |
Physical Address | View project details and contacts |
City, State (County) | Los Angeles, CA 90012 (Los Angeles County) |
Category(s) | Single Trades |
Sub-Category(s) | Plumbing |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Plumbing Fixture Fitting and Trim Manufacturing RIGHT TO REJECT The Department Reserves the Right to Reject Any and All Bids. Aerator, Faucet, Kitchen, 1.3 GPM 55/64 Thread With On/Off Flip-Switch and Manual Dual-Spray Control Thread Is 55/64 MF In Accordance With Attached Kitchen AE 1 & Kitchen AE 2 Pictures. >Flow Rating of 1.3 GPM at 80 PSIM (+5.0%/-10.0% Tolerance) > Meets or Exceeds Current ASME Standard (A112.18.1M) > Packaged in Seperate Plastic Bags > 10-Year Manufacturers Product Warranty > Dual-Spray Control Is for Needle Spray Or Aerated Stream > Non-removable Pressure Compensator > CA Low Lead Compliant Total Bid Price Will Be Reduced by 8% Of the Bid Price, and the Reduced Bid Amount Will Be Deemed as the Evaluated Bid Amount by the Bidder. All questions are due no later than 2:00 p.m. on FEBRUARY 07, 2023.All questions are due no later than 2:00 p.m. on FEBRUARY 07, 2023. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |