Similar Projects
DNR Utahraptor State Park DFCM Construction
New Construction
Design
$19,000,000 est. value
Moab, UT

Bingham Creek Regional Park Phase 2
Post-Bid
Salt Lake City, UT

Millcreek City Hall Climbing Wall Design and Construction
New Construction
Post-Bid
Millcreek, UT

Provo Parks & Recreation
Results
Provo, UT

Homestead Park Pavilion
Renovation
Results
Riverton, UT 84065

Andy Ballard Arena 2022 Improvements
Renovation
Post-Bid
Draper, UT 84020

Parsons Unit Improvements Project
Renovation
Results
$173,000 est. value
UT

Portable Soccer Bench Shelters
New Construction
Post-Bid
Salt Lake City, UT

DFCM Construction - Pre Qualified General - DNR Anasazi State Park Visitor Center Remodel
Renovation
Results
$108,000 est. value
Boulder, UT

Conservation Garden - Observation Deck Rebuild
Renovation
Post-Bid
$200,000 est. value
West Jordan, UT 84088

Unified Police Department Firearms Range Sand Trap Repair
Renovation
Results
$375,000 to $475,000 est. value
Salt Lake City, UT

Harris Community Village, Community Resource Center-Tooele, Ut
New Construction, Renovation
Post-Bid
$22,000,000 est. value
Tooele, UT 84074

Cole Park Pickle Ball Courts
New Construction
Results
Salem, UT

Renovate and Remodel Auction Barn at Golden Spike Event Center
Renovation
Results
Ogden, UT 84404

Construction of the England Acres Park and Wigwam Pavilions Project
New Construction
Results
Tooele, UT 84074

Reported 06/02/2022 12:00 AM
Project Title

Adams Canyon Trailhead Improvements

Physical Address View project details and contacts
City, State (County) Layton, UT 84040   (Davis County)
Category(s) Entertainment/Recreation
Sub-Category(s) Misc. Recreational
Contracting Method Competitive Bids. Bids by Invitation.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Site improvements of the Adams Canyon Trailhead as delineated in the drawings. Major work items will include the following work: Prepare site for the installation of a CXT restroom and drinking fountain; install concrete pathways; construct kiosk; install benches, bike rack, bike repair stand and landscaping improvements.

Details

Misc. Recreational, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 12 - Furnishings, Pews and Benches, Interior Planters and Artificial Plants, Interior Landscaping Accessories.
Division 13 - Special Construction, Fountains.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents