Similar Projects
Wallace Road Multi-Family
New Construction
Conception
$75,000,000 est. value
Charlotte, NC 28212

Greenway Gartens
New Construction - 55,000 SF
Conception
Cornelius, NC 28031

Hilton Garden Inn / Steele Creek
New Construction, Infrastructure - 90,000 SF
Design
$20,700,000 CJ est. value
Charlotte, NC 28202

Solis Birkdale
New Construction - 47,877 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Huntersville, NC 28078

RFQ D/B - Stowe Regional Water Resource Recovery Facility
Addition, Infrastructure
Post-Bid
$200,000,000 CJ est. value
Charlotte, NC 28205

Radius Dilworth
New Construction - 272,975 SF
Post-Bid
$10,000,000 CJ est. value
Charlotte, NC 28202

Unspecified Site Preparation for Pre-Construction Utility Relocations
Term Contract
Results
$500,000 est. value
Charlotte, NC

Mallard Creek Wastewater Reclamation Facility (WRF) Improvements Phase I (Bid Packages 2.01, 2.02, and 2.03)
Infrastructure, Renovation
Results
$3,042,830 CJ est. value
Charlotte, NC 28262

The Edge
New Construction
Construction
Charlotte, NC 28209

The Colony
New Construction - 550,000 SF
Construction
$400,000,000 est. value
Charlotte, NC 28211

600 South Tryon at Legacy Union
New Construction, Renovation
Pending Verification
Charlotte, NC 28202

Birkdale Golf Club Mixed Use
New Construction, Infrastructure - 68,188 SF
Pending Verification
$45,000,000 CJ est. value
Huntersville, NC 28078

North End Depot
New Construction - 15,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Charlotte, NC 28206

Arden at Mallard Creek
New Construction
Design
Charlotte, NC 28200

Mayfield Affordable Housing
New Construction
Post-Bid
Charlotte, NC 28213

Last Updated 11/30/2022 01:34 PM
Project Title

Evoke Living at Morris Field

Physical Address View project details and contacts
City, State (County) Charlotte, NC 28208   (Mecklenburg County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $27,400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of 132 apartment units. As of November 30, 2022, this project is in the early planning stages, and received additional funding from the Housing Trust Fund approval from the City of Charlotte. No building permits have been issued at this time. Information regarding the selection of an architect and general contractor has not been provided. A firm timeline has not been announced, however, construction is unlikely to begin prior to second quarter of 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents