Similar Projects
Last Updated | 12/22/2020 11:37 AM |
Project Title | Annual Public Works Contract |
Physical Address | View project details and contacts |
City, State (County) | Wellington, FL 33414 (Palm Beach County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sanitary Sewers, Storm/Sewers, Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | *Item #29: Dewatering System – This system shall include up to 400LF of header pipe, well points, swing hoses, vacuum pump (12”), fuel, oil (all fluids), and all accessories to operate dewatering system along with jet pump and accessories to install all well points. Hourly rate will be based on actual vacuum pump run time. *Items #30 & 31: 6” and 8” submersible hydraulic pumps will come complete with pumphead, hoses up to 400LF of discharge hose, fuel, and all fluids etc. *Items #32 & 33: Contractor to provide foreman, personnel and transportation (pickup truck). These crews will work on miscellaneous projects throughout Wellington such as fence installation/repair, dewatering set ups, trash and debris clean up, light earthwork, assisting Wellington crews. Pricing/rates shall include – Pickup truck, qualified foreman/crew leader, three (3) to five (5) qualified labors and all misc. hand tools. *Items #34 - Prime and/or painting to be done the same day sandblasting is done. * Items #36, 37, 38, 39, 40, 41 & 42: Pipe Installation Crew – These crews shall consist of five (5) persons (1 Backhoe operator, 1 Loader operator, 2 Pipe layers and 1 Labor). All tools to install pipe/structures shall be furnished by contractor i.e. small plate compactors, laser beams, transit/level, hand tools cables, chain, fuel, oil and all fluids etc… All personnel on these crews including the two operators will be skilled at their assigned position. Backhoe and loader will be the proper size to handle excavation, pipe, inlets and accessories involved in the particular project. Hourly rate shall include costs for all personnel, backhoe, loader tools, and pickup truck etc. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |