Similar Projects
2023 Bond Option A and B - Waxahachie Independent School District
Renovation, Infrastructure
Conception
$576,000,000 CJ est. value
Waxahachie, TX 75165

Davis Road New Alignment - Design and Construction - City of Grand Prairie
Infrastructure
Conception
$9,300,000 CJ est. value
Grand Prairie, TX 76065

Buie Professional Building
New Construction, Infrastructure - 4,500 SF
Design
$850,000 CJ est. value
Midlothian, TX 76065

1215 Crossing Apartments
New Construction, Infrastructure - 229,800 SF
Design
$10,000,000 CJ est. value
Glenn Heights, TX 75154

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

2023-2024 Annual Asphalt Rehabilitation Program Project
Infrastructure
Bidding
$2,000,000 CJ est. value
Midlothian, TX 76065

Water Distribution, Sanitary Sewer and Storm Sewer Facilities to Serve Prairie Ridge Phase 4
Infrastructure
Post-Bid
TX

Water Distribution, Sanitary Sewer and Storm Sewer Facilities to Serve Prairie Ridge Phase 5
Infrastructure
Post-Bid
TX

Ellis Estates - Offsite Water
Infrastructure
Results
TX

Internal Pipeline Cleaning And CCTV Inspection
Term Contract
Results

Crossroads Logistics Park Building 4
New Construction, Infrastructure - 306,925 SF
Construction
$16,114,483 CJ est. value
Midlothian, TX 76065

Crossroads Logistics Park Building 1
New Construction, Infrastructure - 160,775 SF
Construction
$10,114,123 CJ est. value
Midlothian, TX 76065

7 Eleven - Ovilla Road / Glenn Heights
New Construction, Infrastructure - 4,088 SF
Pending Verification
$500,000 CJ est. value
Glenn Heights, TX 75154

Snap Clean Car Wash / Midlothian
New Construction, Infrastructure - 5,084 SF
Pending Verification
$1,500,000 CJ est. value
Midlothian, TX 76065

2023 Bond - Maypearl Independent School District
Addition, Demolition, Infrastructure, Renovation
Conception
$35,000,000 CJ est. value
Maypearl, TX 76064

Last Updated 02/27/2023 08:32 PM
Project Title

Grove Creek Parallel Trunk Sewer

Physical Address View project details and contacts
City, State (County) Waxahachie, TX 75165   (Ellis County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $6,924,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing all labor, material and equipment, and performing all work required to install approximately 16,136 linear feet of 33-inch sanitary sewer by open cut, 61 linear feet of 18-inch sanitary sewer by open cut, 10 linear feet of 30-inch sanitary sewer by open cut, 10 linear feet of 36-inch sanitary sewer by open cut, 923 linear feet of 33-inch sanitary sewer with 48-inch steel encasement pipe (1/4" thick) by other than open cut, Sixty Seven 5-foot diameter sanitary sewer manholes together with all necessary appurtenances, Four 6-foot diameter sanitary sewer manholes together with all necessary appurtenances. Proposals shall be accompanied by a cashier's or certified check upon a national, state bank or savings and loan in an amount not less than five percent (5%) of the total maximum bid price, payable without recourse to the City of Waxahachie, or a bid bond in the same amount from a reliable surety company, holding a permit from the State of Texas to act as surety, as a guarantee that the bidder will enter into a contract and execute performance bond and payment bond within fifteen (15) calendar days after notice of award of contract to him. The notice of award of contract will be given by the Owner within sixty (60) days following the opening of bids. The low bidder must qualify within five working days after bid opening by submitting evidence as the City of Waxahachie may require as necessary to establish the financial responsibility, experience, and possession of such equipment as may be needed to prosecute the work in an expeditious, safe and satisfactory manner. Should the bidder fail to produce evidence satisfactory to the City as stipulated in the specifications on any of the foregoing points, he may be disqualified, and the work awarded to the next bidder so qualifying. The successful bidder must furnish a Performance bond, a Material and Labor Payment Bond, and a 2-year Maintenance Bond, all upon the form provided in the amount of 15 percent of the contract price, from an approved surety company holding a permit from the State of Texas to act as surety or other sureties acceptable to the Owner. The right is reserved, as the interest of the Owner may require, to reject any and all bids, and to waive any informality in bids received. TIME AND ORDER OF COMPLETION All items of work include under this contract shall be substantially completed within three hundred sixtyfive (365) calendar days,

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents