Similar Projects
General Design-Bid-Build & Design Build HubZone Multiple Award Construction Contract for New Construction, Repair, and Renovation of Various Facilities at NAVFAC Washington Area
Design
$250,000 to $2,000,000 est. value

D/B Northeast MATOC
Design
$1,000,000 to $250,000,000 est. value

Air Force Contract Augmentation Program (AFCAP) V
Post-Bid

AFICA Air Force Contract Augmentation Program (AFCAP) IV
Post-Bid

Balistic Missile Defense (BMD) Program
Results

Y--IDIQ Multiple Award Global Contingency Construction Contract Navfac Area of Responsibility and Worldwide
Results
$25,000 to $500,000,000 est. value

Community College of Baltimore County - Essex New Health Careers Technology Building Phase 2
Addition - 190,000 SF
Construction
Less than $65,000,000 est. value
Baltimore, MD

Baltimore County Office Building Renovations
Renovation
Construction
$4,913,621 est. value
Towson, MD

Bowen & Kron Enterprises
New Construction - 16,200 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Middle River, MD

Cockeysville Freight Station
Renovation
Post-Bid
Cockeysville, MD

Army Mechanical MATOC
Results
Less than $2,000,000 est. value

Construction IDIQ
New Construction, Renovation, Demolition
Post-Bid

Master Developer for State Center Maryland Stadium Authority
Results
Baltimore, MD

Mobile Asset Repairs and Renovations
Renovation
Post-Bid

General Contractor - Renovations to Operations Office at M and T Bank Stadium
Renovation - 3,000 SF
Results
Baltimore, MD

Last Updated 12/04/2018 07:18 AM
Project Title

Building Renovations at FSK Campus

Physical Address View project details and contacts
City, State (County) Baltimore, MD   (Baltimore County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,001 to $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description This project includes the construction work for renovation, HVAC, and electrical upgrades to buildings at the Francis Scott Key Bridge Facility. Work will be performed at Buildings 300 and 304.Work includes,but is not limited to, demolition and new work for HVAC equipment, ductwork, piping,electrical power and lighting, new fire protection system and incoming water service to Building 300 for new wet pipe sprinkler building, replacement of windows,roofing, and carpeting. Work also includes upgrades to the elevator in Building 300,and replacement of floor, plumbing and plumbing fixtures in the ground floor restrooms, and ADA upgrades and plumbing fixture replacements in restrooms on floors 2 and 3 in Building 300.Building 304 will also include ADA upgrades to the Men's Restroom, and creation of a new Women's Restroom within the existing building. The interior wall will also be moved between the locker room and lunchroom. Contractor will also have to perform services to assist the third party Commissioning Agent in commissioning activities.
Details
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents