Similar Projects
Last Updated | 01/06/2022 10:27 AM |
Project Title | Reconstruct Lee's Pond Asphalt Walkway |
Physical Address | View project details and contacts |
City, State (County) | Attleboro, MA 02703 (Bristol County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Sidewalks/Parking Lot |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $42,500 |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Remove and replace bituminous concrete walkway approximately 575 sq yards (1) Excavate existing material and dispose of at an approved asphalt recycling facility. (2) Furnish and install gravel as needed (3) Fine grade and roll to proper compaction (4) Pave 2” of 3/8 bituminous asphalt surface course (5) Barricade off at completion until asphalt is ready for pedestrian traffic (6) Erosion control must be installed on pond side of project (7) Loam and seed will be added to any grass areas disrupted during the project. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |