Similar Projects
Utilities - SH 132
Infrastructure
Design
$500,000 est. value

Utilities - SH 132
Infrastructure
Design
$500,000 est. value

Bureau of Reclamation Inspection and Regulating Tank Improvements McGee Creek Reservoir
Infrastructure
Bidding
$839,500 CJ est. value
Atoka, OK 74525

2023 Maple Street Construction Project
Infrastructure
Bidding
$3,000,000 CJ est. value
Okeene, OK 73763

137th Backflow Repair
Term Contract
Post-Bid
Oklahoma City, OK

Forster Drive Waterline Relocation
Infrastructure
Post-Bid
$200,000 est. value
Mustang, OK 73064

Waterline Replacement - Memorial Road and Lake Hefner Parkway
Infrastructure
Results
$875,000 est. value
Oklahoma City, OK

Hinton Waterline Extension
Infrastructure
Results
$325,000 est. value
Hinton, OK

Stilwell Public Schools Classroom Addition
Addition, Demolition, Infrastructure
Construction
$497,300 CJ est. value
Stilwell, OK 74960

NW 10th @ The Stack
New Construction, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Yukon, OK 73099

The Community at Surrey Plaza
New Construction, Infrastructure
Pending Verification
$9,000,000 CJ est. value
Oklahoma City, OK 73099

Utilities - SH 152
Infrastructure
Design
$272,500 CJ est. value
Sayre, OK 73662

ODOT Relocation
Infrastructure
Bidding
$90,000 CJ est. value
Stilwell, OK 74960

High School Baseball/ Softball Turf
Infrastructure
Post-Bid
$1,800,000 CJ est. value
Yukon, OK 73099

OKC Zoo Water Line Extension
Infrastructure
Results
$500,000 est. value
Oklahoma City, OK

Last Updated 02/22/2023 03:07 AM
Project Title

Utilities - US 64

Physical Address View project details and contacts
City, State (County) Forgan, OK 73938   (Beaver County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected April 2024
Bids Due View project details and contacts
Estimated Value $900,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Us-64: Begin Approx 6.0 Mi West of the Jct Us-270, Extend East Approx 6 Mi (Thru Forgan) (Ut for 34962(04)) As of February 22, 2023, the project is in Design status. Anticipated letting month/year is September, 2023. Length : 5.980 Mi. OKDOT - Utilities - US 64 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents