Similar Projects
Tank Replacement at Jefferson Patterson Park and Museum
Bidding
Less than $100,000 est. value
Saint Leonard, MD 20685

Maryland State Police Barrack "A" Waterloo Tank Replacement
Bidding
$500,000 to $1,000,000 est. value
Jessup, MD 20794

Industrial Park Elevated Storage Tank Recoating
Post-Bid
Princess Anne, MD 21853

Underground Storage Tank Repairs 2019
Post-Bid
Baltimore, MD 21201

Cliffton Water System Improvements - Elevated Storage Tank
Results
Newburg, MD 20664

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Tank Replacement at Maryland State Police Mchenry Barrack
Bidding
Less than $100,000 est. value
McHenry, MD 21541

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

Equalization Tank Replacement - Riddle Farm Wastewater Treatment
Results
Ocean Pines, MD 21811

Richfield Station Hydropillar Water Storage Tank
Bidding
Chesapeake Beach, MD

4,000 Gallon Storage Tank for Blue Juice Lavfluid
Post-Bid
Andrews Air Force Base, MD 20762

City Hall Underground Storage Tank Abandonment
Term Contract
Results
Less than $9,000 est. value
Hagerstown, MD 21740

Underground Storage Tank Abandonment
Results
Less than $9,000 est. value
Hagerstown, MD 21740

10,000 Gallon Hydro Pneumatic Water Tanks
Results
MD

Ballast Tank Preservation
Results
Baltimore, MD

Last Updated 12/28/2020 10:01 AM
Project Title

Tank Replacement

Physical Address View project details and contacts
City, State (County) Hagerstown, MD 21746   (Washington County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Provide a 275 gallon temporary tank for diesel fuel to supply the Regional Maintenance Building. The temporary tank shall be placed on the lawn adjacent to the building with the fuel lines run to the relocated existing fuel pumping module in the building. Filter and transfer fuel from the existing 5,000 gallon underground. Any excess fuel will be filtered and transported by the contractor to the campus as directed by Mr. Mills. Coordinate all work with the Maintenance Manager 2. The Contractor shall be solely responsible for locating all existing underground utilities, prior to excavation, using an independent utility locator at least 48 hours prior to excavation. Obtain all possible existing utility location information from the State Representative as well. 3. Excavate and remove the existing UST tank and all associated piping 4. Fill the tank excavation to the level of the sidewalk with clean fill to 12” below the original grade. Place 12” of clean topsoil to bring the excavation site back to the original grades. 5. Design and install a new concrete tank pad to support a 3,000 gallon AST diesel tank after the UST is removed. The design shall include four (4) steel pipe bollards to protect the tank from vehicular impact. 6. Provide a new UL-2085 labeled 3,000 gallon rectangular AST fuel oil tank with level gauge reading in inches, access ladder, fill port with spill bucket, stick port, ATG System and vents as required by state and/or federal regulations. 7. The area excavated in order to remove the existing underground tank, and install the newly provided tank, shall be repaired by providing fill which needs to be compacted, top soil, grass seed, straw and grading as required to the satisfaction of the Owner. 8. Provide soil tests in the tank excavation area for petroleum contamination under “Unit Pricing “as testing required by MDE: 1. Perform 8015B TPH-DRO/GRO, 8260 Full Suite VOC’s including fuel oxygenates, and 8021 BTEX MTBE TBA. 2. Work shall include obtaining, transporting, testing, and analysis of sample to meet the requirements of that particular test. 9. Provide and install a new Veeder Root TLS 350 tank gauge system to monitor the product level in the tank and to provide leak detection in the interstitial space of the tank

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents