Similar Projects
S-252 D, E & F Culvert Repair Project, Indian River County, Florida
Post-Bid
$2,000,000 to $5,000,000 est. value
FL

Cascades Mixed Use Development Gadsden St Utility Replacement/Upgrades
Renovation
Post-Bid
Tallahassee, FL

Golf Links Stormwater Improvements
Results
Less than $232,359 est. value
Crestview, FL

Short Street Stormwater Outfall Project
Results
Tallahassee, FL

Construction Services for Master Project Improvements (Phases 1, 2, and 3)
Post-Bid
Winter Haven, FL 33880

Performance Pond
Results
Less than $1,145,038 est. value
FL

Lake Hunter Stormwater BMP Retrofit
Post-Bid
Lakeland, FL 33801

City of Pahokee Glades Citizen Villas Storm Water Project
Results
Pahokee, FL

Repair Storm Drainage System, ASCW, Clearwater, Fl
Post-Bid
$25,000 to $100,000 est. value
Clearwater, FL 33762

Stormwater Improvements - Rain Gardens
Results
$180,000 est. value
Haines City, FL 33844

Construction Services for Master Project Improvements (Phase 2)
Post-Bid
Lakeland, FL 33801

Raintree Stow & Menedez Outfalls at Bayou Texar Stormwater Treatment Enhancement Project
Results
Pensacola, FL

Construction Services For Riverstone Phase 2
Post-Bid
Lakeland, FL

Stormwater Aeration and Fountain Maintenance
Results
Fort Myers, FL

Downtown Stormwater Park Leak
Post-Bid
Titusville, FL

Last Updated 03/26/2019 02:58 PM
Project Title

South Jetty Improvements for the Hillsboro Inlet

Physical Address View project details and contacts
City, State (County) FL   (Broward County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The project is the one-time restoration of the Hillsboro Inlet South Jetty. The work includes the reuse of the existing inner row of 121 concrete piles as a foundation for an extended concrete cap with limestone armor stone on either side. The existing concrete panel and king piles will be left in place. A 32" wide by 5'5" tall concrete cap will be cast-in-place along the length of the jetty, with the concrete pile caps embedded a minimum of 9 inches into the cap. The project will also reconfigure and reinforce the existing 2,850 cubic yards of armor stone along the foundation of the jetty by adding approximately 950 cubic yards of new limestone boulders to both sides of the jetty. The new limestone boulder footprint will extend approximately 2-10 feet from the existing footprint and will be in water depths approximately 8 to 13 feet deep along the southeast and northwest sides of the jetty. The addition of new limestone boulders will increase the total footprint area of the jetty from approximately 0.36 acres to approximately 0.50 acres. Location:This project is located on the south side of the Hillsboro Inlet, Section 29, Township 48 South, Range 43 East, in the City of Hollywood, Florida
Details
Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents